Narmada is the fifth largest river in the country and is the largest west flowing river. It also represents a classic example of integrated river basin planning and development, implemented successfully. Sardar Sarovar being the last terminal dam on this mighty river, has to face a typical tail end syndrome in terms of water management, as it has to absorb and adjust with the releases from the upstream major dams like Omkareshwar and Indira Sagar.
Almost 97% catchment of the Sardar Sarovar Project (SSP) lies in the state of Madhya Pradesh. Entire stretch of river Narmada from Amarkantak to Sardar Sarovar Project (1,163 km) was subjected to heavy rains during last one fortnight. Analysis of rainfall in Narmada basin was showing 7.4% deficit on August 16, 2020, and having 18.6% excess rainfall as on August 31, 2020.
Huge amount of water volume was received at Indira Sagar project (the largest dam in the basin), between August 20 and September 1, 2020 -- 14,660 million cubic metre of water as against the live storage capacity of Indira Sagar Project (ISP) of 9,745 million cubic metre, more than 80% of which was already filled at the beginning of this spell.
Major dams in the upstream of ISP, namely Bargi and Tawa, were also almost filled up and were not in a position to hold any more water. Consequently, Indira Sagar project continuously received more than 10 to 12 lakh cusecs of inflow, with the maximum inflow of 16.13 lakh cusecs on August 30, 2020 at 06.00 hours.
With ISP also filled up to more than 95% of its capacity, they had no other choice but to release it in the downstream. Same was the case at Omkareshwar which resulted into heavy outflow from Omkareshwar Sagar Project (OSP) and it got further added up due to heavy rains in the intermittent catchment between OSP and SSP. Compound effect of all these resulted into continuous huge inflow into SSP. 
Making use of the state of the art technology and with scientific analysis and coordinated operations of various reservoirs with the help of the Central Water Commission (CWC) and the Narmada Control Authority (NCA), the Sardar Sarovar reservoir was operated in such a way that the spillway discharge could be restricted to less than 10 lakh cusecs for most of the times with a maximum of (peak) to 10.72 lakh cusecs at 14.00 hours on September 1, 2020 (as against the spillway discharge carrying capacity of 30 lakh cusecs). 
Keeping in view the safety of the people in Bharuch city and about 30 villages on the banks of Narmada, spillway discharge was gradually managed, starting from 50,000 cusecs on August 28, 2020 at 18.00 hours to 2.65 lakh cusecs at 23.00 hours and further to 7.6 lakh cusecs at 22.00 hours on August 29, 2020. Every time advance alerts were issued to all the concerned authorities and in turn to the general public.
It is needless to state that flood routing using the available live storage capacity of the dam and keeping adequate cushion to accommodate future storms' run-off expected as per the stochastic hydrological analysis, are nothing but sound engineering principles and practices for operating spillway gates of any major dam.
Putting this into practice efficiently this year, Sardar Sarovar Dam has saved around 30,000 hectares of downstream area from the adverse hit of flood damages. This would be further evident from the fact that on August 28, 2020 at 8 am, the Sardar Sarovar Dam was already filled up 130.85 metre and was having live storage of 3,417 million cubic metre. This means that considering its live storage capacity of 5,760 million cubic metre its balance holding capacity was only 2,343 million cubic metres on that day.
Some well-known anti-dam activists have been attempting to curse Sardar Sarovar Dam and its project authorities by making false allegations
After that during August 28, 2020 to September 3, 2020, more than 10,000 million cubic metres of inflow was received at the Sardar Sarovar Dam which has been safely negotiated through scientifically carried out flood routing and that too without compromising with future flood absorption potential required to be kept on any given date.
Status of all major dams in Narmada basin as on Sepmtember 3, 2020 is as under:  
Some well-known activists who are anti-dam in general and anti-Sardar Sarovar in particular have been still attempting to curse Sardar Sarovar Dam and its project authorities by making false allegations of having created "avoidable flood disaster" (see  "Behind 'avoidable' flood disaster in Narmada from Aug 29 to Sept 1 in South Gujarat", Counterview, September 3, 2020).
Instead of allowing the people in the downstream areas to share their experience of having a great sigh of relief this year amidst very heavy rainfall in the Narmada basin, factually incorrect information is being deliberately disseminated. 
A few classic examples are: 
  1. Till Saturday, August 29, 2020 early hours, they (Sardar Sarovar Dam operators) were not releasing any water from spillway gates of dam (in fact, spillway gate operation was already started at 18.00 hours on August 28, 2020).
  2. In the evening of Tuesday September 1, 2020, they (Sardar Sarovar Dam operators) closed most of the spillway gates, thus reducing releases from spillway to less than a 10th of the earlier figure (in fact, maximum outflow from the Sardar Sarovar Dam was 10.72 lakh cusecs on September 1, 2020 at 14.00 hours which was reduced thereafter to meet with the challenges of full moon [Poonam] on September 2, 2020). 
  3. Sardar Sarovar powerhouses produced peak of 26.91 million units on September 2, 2020, this again shows underutilisation of power station (in fact, operation of the River Bed Power House was started on August 26, 2020 and gradually stepped up to operation of all the six turbines at 10.00 hours on August 30, 2020). 
  4. CWC also provided warning and advisories that Sardar Sarovar Project authorities clearly ignored (in fact, not a single warning or advisory has been ignored. on the contrary the Sardar Sarovar Narmada Nigam Limited has worked in close coordination with CWC, NCA and the authorities of upstream dams in Madhya Pradesh). 
Anyway, good part of even such misinformation campaign is that, staunch opponents of Sardar Sarovar Dam have also started believing that it has the potential to be flood moderator!
---
*KV Sanghavi is retired secretary, Government of Gujarat; JB Patel and Dr VM Yagnik are retired chief engineers, Government of Gujarat; LS Sharma is retired Managing Director, Electronics & Quality Development Centre, Government of India

Comments

Anonymous said…

The Authors of this article are retired bureaucrats and technocrats. How come retired bureaucrats became so active after retirement in order to defend the Sardar Sarovar Dam operation in September, 2020 while they are drawing pension sitting at home?

Notably, there are no proper references to all the data furnished in this article. Which means, the data about the reservoir releases, the time of spillway gate operation, the discharge from Sardar Sarovar Dam, etc.. are all unreliable.

Surprisingly, authors are silent on the Sardar Sarovar rule curve. They should have transparently disclosed the reservoir rule curve/dam operation curve in this article if they are really sincere and honest, so that readers themselves could have judged the genuineness of their story of this article.

Readers and scholars should note that the data related to discharge, reservoir operation rule curve are all hidden from public view. These authors are the same bureaucrats who kept data secret from public gaze during their entire service and now they are writing stories as if they were present during August/September exactly at the time of unfortunate floods downstream of Sardar Sarovar dam. They are retired and sitting at home sipping coffee, where were they on August, 29, 2020, September 1, 2020 etc...is not mentioned!

Readers and scholars should note that Central Water Commission is another unreliable and non-transparent organization when it comes discharge data, flood forecast and dam safety. If you analyze discharge data of Central Water Commission, you will see worst quality of discharge data where there is computed values, NULL data, missing data and these retired bureaucrat authors are deliberately hiding the technically unsound organization called Central Water Commission. For example: Just see the quality of discharge data at Neeleshwaram site belonging to Central Water Commission in Kerala available on SANDRP site. You will vomit immediately on seeing the data quality.

Central Water Commission flood forecast is based on outdated gauge-to-gauge correlation that is 50 years behind the current technology of Ensemble model based forecast. The lead time of this gauge-to-gauge is just 10 -124 hours. Whether the authors of the article know the latest ensemble technology of flood forecast? Only recently, Central Water Commission has began rainfall-runoff hydrological model based forecast. It is not clear what model Central Water Commission used for inflow forecast of Sardar Sarovar? Can these retired bureaucrats able to answer? I am sure the retired Secretary has never once in his life time has done hands on a hydrological model.

Whether the authors who write advance alerts were given to authorities able to say, whether the authorities understood the alerts, what was the lead time of those alerts, whether the lead time was adequate? No answers.

Certainly this article is scientifically useless and has no significance particularly when there is no display of reservoir rule curve of Sardar Sarovar and other upstream dams.


Dam Manager


Anonymous said…

The lead time of this gauge-to-gauge is just 10 -24 hours not 124 hours (Seems typo). 24 hours lead time is the "aukaat" of Central Water Commission. Whereas Ensemble Forecast adopted in USA and UK gives 15 days lead time.
Shashidhar said…
Anonymous bhai, Central Water Commission is a racist/casteist organization with no law and order. Racist people run it like their private company with no transparency and accountability. Authors think readers are naive when they mention Central Water Commission.

Shashi

TRENDING

Mergers and privatisation: The Finance Minister’s misguided banking agenda

By Thomas Franco   The Finance Minister has once again revived talk of merging two or three large public sector banks to make them globally competitive. Reports also suggest that the government is considering appointing Managing Directors in public sector banks from the private sector. Both moves would strike at the heart of India’s public banking system . Privatisation undermines the constitutional vision of social and economic justice, and such steps could lead to irreversible damage.

Political misfires in Bihar: Reasons behind the Opposition's self-inflicted defeat

By Vidya Bhushan Rawat*  The Bihar Vidhansabha Election 2025 verdict is out. I maintained deliberate silence about the growing tribe of “social media” experts and their opinions. Lately, these do not fascinate me. Anyone forming an opinion solely on the basis of these “experts” lives in a fool’s paradise. I do not watch them, nor do I follow them on Twitter. I stayed away partly because I was not certain of a MahaGathbandhan victory, even though I wanted it. But my personal preference is not the issue here. The parties disappointed.

Buddhist shrines were 'massively destroyed' by Brahmanical rulers: Historian DN Jha

Nalanda mahavihara By Rajiv Shah  Prominent historian DN Jha, an expert in India's ancient and medieval past, in his new book , "Against the Grain: Notes on Identity, Intolerance and History", in a sharp critique of "Hindutva ideologues", who look at the ancient period of Indian history as "a golden age marked by social harmony, devoid of any religious violence", has said, "Demolition and desecration of rival religious establishments, and the appropriation of their idols, was not uncommon in India before the advent of Islam".

Celebrating 125 yr old legacy of healthcare work of missionaries

Vilas Shende, director, Mure Memorial Hospital By Moin Qazi* Central India has been one of the most fertile belts for several unique experiments undertaken by missionaries in the field of education and healthcare. The result is a network of several well-known schools, colleges and hospitals that have woven themselves into the social landscape of the region. They have also become a byword for quality and affordable services delivered to all sections of the society. These institutions are characterised by committed and compassionate staff driven by the selfless pursuit of improving the well-being of society. This is the reason why the region has nursed and nurtured so many eminent people who occupy high positions in varied fields across the country as well as beyond. One of the fruits of this legacy is a more than century old iconic hospital that nestles in the heart of Nagpur city. Named as Mure Memorial Hospital after a British warrior who lost his life in a war while defending his cou...

New RTI draft rules inspired by citizen-unfriendly, overtly bureaucratic approach

By Venkatesh Nayak* The Department of Personnel and Training , Government of India has invited comments on a new set of Draft Rules (available in English only) to implement The Right to Information Act, 2005 . The RTI Rules were last amended in 2012 after a long period of consultation with various stakeholders. The Government’s move to put the draft RTI Rules out for people’s comments and suggestions for change is a welcome continuation of the tradition of public consultation. Positive aspects of the Draft RTI Rules While 60-65% of the Draft RTI Rules repeat the content of the 2012 RTI Rules, some new aspects deserve appreciation as they clarify the manner of implementation of key provisions of the RTI Act. These are: Provisions for dealing with non-compliance of the orders and directives of the Central Information Commission (CIC) by public authorities- this was missing in the 2012 RTI Rules. Non-compliance is increasingly becoming a major problem- two of my non-compliance cases are...

N-power plant at Mithi Virdi: CRZ nod is arbitrary, without jurisdiction

By Krishnakant* A case-appeal has been filed against the order of the Ministry of Environment, Forest and Climate Change (MoEF&CC) and others granting CRZ clearance for establishment of intake and outfall facility for proposed 6000 MWe Nuclear Power Plant at Mithi Virdi, District Bhavnagar, Gujarat by Nuclear Power Corporation of India Limited (NPCIL) vide order in F 11-23 /2014-IA- III dated March 3, 2015. The case-appeal in the National Green Tribunal at Western Bench at Pune is filed by Shaktisinh Gohil, Sarpanch of Jasapara; Hajabhai Dihora of Mithi Virdi; Jagrutiben Gohil of Jasapara; Krishnakant and Rohit Prajapati activist of the Paryavaran Suraksha Samiti. The National Green Tribunal (NGT) has issued a notice to the MoEF&CC, Gujarat Pollution Control Board, Gujarat Coastal Zone Management Authority, Atomic Energy Regulatory Board and Nuclear Power Corporation of India Limited (NPCIL) and case is kept for hearing on August 20, 2015. Appeal No. 23 of 2015 (WZ) is filed, a...

Whither GIFT City push? Housing supply soars in Mumbai, Hyderabad, Pune, not Ahmedabad

By Rajiv Shah    A new report by a firm describing itself as a "digital real estate transaction and advisory platform," Proptiger , states that the Mumbai Metropolitan Region (MMR) has been the largest contributor to housing units among India's top eight cities currently experiencing a real estate boom. Accounting for 26.9% of all new launches, it is followed by Pune with 18.7% and Hyderabad with 13.6%. These three cities collectively represented 59.2% of the new inventory introduced during the third quarter (July to September 2025), which is the focus of the report’s analysis. 

Only one Indian national park rated ‘good’ by IUCN: Concerns over ecological governance

By A Representative   Environmental policy expert Shankar Sharma has written to the Ministry of Environment, Forest and Climate Change (MoEF&CC) and its affiliated institutions, expressing grave concern over India’s deteriorating ecological health. Citing the International Union for Conservation of Nature (IUCN)’s latest global review, which found that only Khangchendzonga National Park received a “Good” rating among 107 national parks, Sharma warned that the findings reveal a “serious concern for the overall health of the country’s flora, fauna, and environment.”

A comrade in culture and controversy: Yao Wenyuan’s revolutionary legacy

By Harsh Thakor*  This year marks two important anniversaries in Chinese revolutionary history—the 20th death anniversary of Yao Wenyuan, and the 50th anniversary of his seminal essay "On the Social Basis of the Lin Biao Anti-Party Clique". These milestones invite reflection on the man whose pen ignited the first sparks of the Great Proletarian Cultural Revolution and whose sharp ideological interventions left an indelible imprint on the political and cultural landscape of socialist China.