Skip to main content

India No 1 in world coal mining boom, thanks to Coal India, Adani Group: German NGO

By Rajiv Shah 

Urgewald, a German environment and human rights NGO, which claims to be working for establishing strong environmental and social standards for the international finance industry, has called India "the number one hotspot of the coal mining boom" in the world. It states this in a report "The 2023 Global Coal Exit List (GCEL): Failing the Phase-Out", prepared by Urgewald and more than 40 NGO partners, seeking to offer in-depth information on over 1,433 companies operating worldwide along the thermal coal value chain.
Stating that India's coal production "already reached a historic high of 893 million tons last year", the report, released a few weeks after the UN’s Climate Ambition Summit in New York, quotes the goal set by India’s Ministry of Coal and Mines, according to which, the country’s annual coal production would rise to 1.5 billion tons by 2030.
"To fulfill this plan, the government has auctioned off 92 new coal mining concessions since 2020; hundreds more are in the pipeline", says Urgewald in the report, which approvingly quotes Joe Athialy, director of the Centre for Financial Accountability, Delhi, as saying, “What is being auctioned off here are the traditional homelands of hundreds of thousands of India’s tribal people and forest areas that are incredibly rich in biodiversity and play a key role in maintaining water cycles. It’s absurd to pretend this immense destruction is in the national interest.”
Stating that of the top three coal mining developers, two are from India, the report says, "The world’s top three coal mine developers are Coal India with projects totaling 591 million tons of new coal production per year, China Energy Investment with 169 million tons and the Adani Group with 94 million tons."
It continues, "While the first two companies are state-owned, the Adani Group belongs to the billionaire Gautam Adani whose business has profited time and again from his close ties to the Modi government. Today, Adani is the world’s largest private coal mine developer."
The report adds, "The conglomerate owns coal mines in three countries, is a major trader and transporter of coal, operates a 16 GW coal plant fleet (with another 10 GW in the pipeline), and plans to build a huge US$ 4 billion coal-to- plastics facility in India. While one of the Adani Group’s 9 listed subsidiaries – Adani Green Energy – develops solar projects, the Group’s renewable investments are dwarfed by its enormous coal portfolio."
Claiming that there is "a pervasive pattern of intercompany lending, including transactions between Adani Green Energy and Group entities involved in coal expansion", about which controversial short-seller Hindenburg Research's 106-page report and subsequent investigations state, the report says, "Filings by the State Bank of India have shown that shares from Adani Green Energy and other Group subsidiaries were used as collateral in a credit facility for Adani’s enormous Carmichael coal mine in Australia."
“Adani is a stark example of why responsible investors need to divest all subsidiaries of coal developers. It’s an illusion to believe that investments in the green arm of a company aren’t cross-subsidizing its other activities,” comments Urgewald director Schuecking.
Profiting time and again from close ties with the Modi government, today, Adani is the world’s largest private coal mine developer
The report regrets, with over 7.2 billion tons, "the world’s thermal coal production reached an alltime high in 2022" with "new coal mines still on the horizon in 31 countries." It adds, "All in all, companies on the GCEL are planning to develop new thermal coal mining projects with a total capacity of 2.5 billion tons per year, an amount equal to over 35% of the world’s current production" -- with India all set to experience "coal mining boom", as its coal production having reached "a historic high of 893 million tons last year."
While releasing the the GCEL list, the report quotes Heffa Schuecking, director of Urgewald, says, “The overall picture that our data delivers is bleak. Out of the 1,433 companies on the GCEL, only 71 companies have announced coal exit dates. Meanwhile, 577 companies are still developing new coal assets."
According to the report, "Despite coal plant closures in some parts of the world, the global coal plant fleet has seen a net growth of 186 GW since the Paris Agreement was signed. To put this into perspective: 186 GW are more than the operating coal plant fleets of Germany, Japan, South Korea and Indonesia combined."
It continues, "According to the 2023 GCEL, companies are still planning to develop an additional 516 GW of new coal-fired capacity. If built, these projects would increase the world’s current installed coal-fired capacity by 25%."
According o the report, "Two-thirds of this new capacity is planned in China, which has been ramping up its coal power plans since 2022, when drought diminished the country’s hydropower output and record-breaking heat waves caused electricity demand to skyrocket."
It adds, "Out of the 39 countries where new coal power plants are still in the pipeline, the largest capacity additions are planned in India (72 GW), Indonesia (21 GW), Vietnam (14 GW), Russia (12 GW) and Bangladesh (10 GW)."

Comments

TRENDING

Swami Vivekananda's views on caste and sexuality were 'painfully' regressive

By Bhaskar Sur* Swami Vivekananda now belongs more to the modern Hindu mythology than reality. It makes a daunting job to discover the real human being who knew unemployment, humiliation of losing a teaching job for 'incompetence', longed in vain for the bliss of a happy conjugal life only to suffer the consequent frustration.

Where’s the urgency for the 2,000 MW Sharavati PSP in Western Ghats?

By Shankar Sharma*  A recent news article has raised credible concerns about the techno-economic clearance granted by the Central Electricity Authority (CEA) for a large Pumped Storage Project (PSP) located within a protected area in the dense Western Ghats of Karnataka. The article , titled "Where is the hurry for the 2,000 MW Sharavati PSP in Western Ghats?", questions the rationale behind this fast-tracked approval for such a massive project in an ecologically sensitive zone.

A Hindu alternative to Valentine's Day? 'Shiv-Parvati was first love marriage in Universe'

By Rajiv Shah  The other day, I was searching on Google a quote on Maha Shivratri which I wanted to send to someone, a confirmed Shiv Bhakt, quite close to me -- with an underlying message to act positively instead of being negative. On top of the search, I chanced upon an article in, imagine!, a Nashik Corporation site which offered me something very unusual. 

Will Bangladesh go Egypt way, where military ruler is in power for a decade?

By Vijay Prashad*  The day after former Bangladeshi Prime Minister Sheikh Hasina left Dhaka, I was on the phone with a friend who had spent some time on the streets that day. He told me about the atmosphere in Dhaka, how people with little previous political experience had joined in the large protests alongside the students—who seemed to be leading the agitation. I asked him about the political infrastructure of the students and about their political orientation. He said that the protests seemed well-organized and that the students had escalated their demands from an end to certain quotas for government jobs to an end to the government of Sheikh Hasina. Even hours before she left the country, it did not seem that this would be the outcome.

Structural retrogression? Steady rise in share of self-employment in agriculture 2017-18 to 2023-24

By Ishwar Awasthi, Puneet Kumar Shrivastav*  The National Sample Survey Office (NSSO) launched the Periodic Labour Force Survey (PLFS) in April 2017 to provide timely labour force data. The 2023-24 edition, released on 23rd September 2024, is the 7th round of the series and the fastest survey conducted, with data collected between July 2023 and June 2024. Key labour market indicators analysed include the Labour Force Participation Rate (LFPR), Worker Population Ratio (WPR), and Unemployment Rate (UR), which highlight trends crucial to understanding labour market sustainability and economic growth. 

Venugopal's book 'explores' genesis, evolution of Andhra Naxalism

By Harsh Thakor*  N. Venugopal has been one of the most vocal critics of the neo-fascist forces of Hindutva and Brahmanism, as well as the encroachment of globalization and liberalization over the last few decades. With sharp insight, Venugopal has produced comprehensive writings on social movements, drawing from his experience as a participant in student, literary, and broader social movements. 

Authorities' shrewd caveat? NREGA payment 'subject to funds availability': Barmer women protest

By Bharat Dogra*  India is among very few developing countries to have a rural employment guarantee scheme. Apart from providing employment during the lean farm work season, this scheme can make a big contribution to important needs like water and soil conservation. Workers can get employment within or very near to their village on the kind of work which improves the sustainable development prospects of their village.

'Failing to grasp' his immense pain, would GN Saibaba's death haunt judiciary?

By Vidya Bhushan Rawat*  The death of Prof. G.N. Saibaba in Hyderabad should haunt our judiciary, which failed to grasp the immense pain he endured. A person with 90% disability, yet steadfast in his convictions, he was unjustly labeled as one of India’s most ‘wanted’ individuals by the state, a characterization upheld by the judiciary. In a democracy, diverse opinions should be respected, and as long as we uphold constitutional values and democratic dissent, these differences can strengthen us.

94.1% of households in mineral rich Keonjhar live below poverty line, 58.4% reside in mud houses

By Bhabani Shankar Nayak*  Keonjhar district in Odisha, rich in mineral resources, plays a significant role in the state's revenue generation. The region boasts extensive reserves of iron ore, chromite, limestone, dolomite, nickel, and granite. According to District Mineral Foundation (DMF) reports, Keonjhar contains an estimated 2,555 million tonnes of iron ore. At the current extraction rate of 55 million tonnes annually, these reserves could last 60 years. However, if the extraction increases to 140 million tonnes per year, they could be depleted within just 23 years.