Regional ring road around Hyderabad to 'uproot' fertile farm lands, packed villages

By Narasimha Reddy Donthi* 

The Regional Ring Road for Hyderabad is proposed with an approximate length of 338 kilometres, and at a distance of 50 Km from Hyderabad. This greenfield (new) expressway will be another ring road, in addition to the existing Outer Ring Road (ORR) of 158 km.
Thus, Hyderabad will have two ring roads, which is probably unique to any metro city in India. Both the roads fall under the Hyderabad Metropolitan Development Area (HMDA) of 7,257 sq km. Both the roads do not figure in the Master Plans, indicating adhoc plans and non-seriousness in scientific assessment of its requirement.
Not enough evidence or argument has been built for this RRR within a decade of the completion of the ORR. With ORR yet to be used fully, the need for another ring road, within a distance of 25 km, is unnecessary and unjustified.
Proposed regional ring road expressway around Hyderabad is set to affect fertile agricultural lands, and densely populated villages filled with structures and houses. Precious agricultural land will be lost to the project, which has minimal gains for the local populace. Road alignment is always subject to pressures from real estate lobby and the powerful elite, invariably impacting the poor and the voiceless.
In the past, the Outer Ring Road has undergone several changes in its alignment, ultimately burdening the public exchequer, environment and the poor people. Frequent changes in ORR alignment, owing to dictates of the powerful elite, has done irreversible damage impacting water resources, water bodies and local natural water cycle.
Number of hillocks have vanished, while a few were sliced open to allow the ORR alignment. Natural streams were destroyed. Mrugavani and other natural forests were also impacted negatively. An audit of ORR is required to understand how these impacts could have been avoided.
Just like ORR, the Regional Ring Road expressway is mostly designed to exclude local population from using it. Usually elevated, expressways are designed to exclude many types of road users and slow vehicles.
Expressways have become a death trap for pedestrians as the road design lacks footpaths, crossroads, cycle lanes, street lamps, medians, overhead bridges, traffic lamps and dividers. Rural folk, living on either side of the proposed RRR, who use different modes and methods of transport, including livestock, would be several affected.
Livestock grazing areas are either divided or encroached, thus, effectively killing livestock-based livelihoods, including sheep, goats, buffaloes, cows and poultry.
Without committed efforts to safeguard the environment from the Telangana government and national government, RRR will increase the pressure on the State’s land, forests, water systems, wetlands, grassland ecosystems, and other natural resources--assets many of the poor depend on for their livelihoods.
Livelihood loss can increase poverty, unemployment and nature-based production and can have a cascading effect on Gross State Domestic Product. Telangana GDP, and thus national GDP, is at risk because of these huge road projects, whose benefits have not been assessed scientifically so far.
On the other hand, air pollution is likely to increase in the area as land and soil are disturbed. Food production within a 150 km radius area would reduce gradually to zero, with consequences on hunger, nutrition and future generation growth.
The project does not help in developing and diversification of the economic opportunities in surrounding districts and mandals, since RRR is not about improving transport facilities and services in rural areas. It does not enhance employment and income generating opportunities for the local people and does not create inter-district trade routes.
The design of the RRR project is not inclusive and will affect economic growth prospects of the local people especially poor and women. Even the unskilled employment generated during this road project implementation does not help local people, as mostly migrants are employed.
ORR and widening of other roads connecting Hyderabad have led to removal of lakhs of trees, flattening of hillocks as they contributed soil and rock metal for road construction, and destruction of natural streams and local aquifers. RRR is likely to cause similar impact multiple times of what has happened due to ORR.
Regional Ring Road will increase the overall appeal of real estate sector in this area, especially the projects between ORR and RRR. This road accelerates urbanization, concretization, natural resource transfer from the poor to the rich and land ownership consolidation.
Urban design, especially zonal regulations, needs to be reviewed in this context. Since almost all of the RRR project falls under HMDA Master Plan area, Master Plan of HMDA area requires review and appropriate integration of zonal development plans.
The Telangana government does not have comprehensive approach towards its transport sector in improving its institutional, financial, and operational efficiency to maintain sufficient transport infrastructure (including State roads, national highways, and expressways) and to improve road safety.
Detailed project report has not been shared in the public domain. Only bits and pieces of information are shared in the newspapers, without giving a comprehensive view of the project. Government of Telangana has so far not clarified whether it is planning to acquire additional land around the proposed RRR, from the transport corridor. The NHAI notification does not give specific land survey numbers.
The Minister of Road Transport and Highways, Government of India, and the Telangana government must stop all activities related to Regional Ring Road expressway until the following is done:
  1. Detailed project Report is developed and shared in the public domain. Provisions requiring environmental permits and forest clearances—and at least 80% of site availability at commencement — have to be focused upon. DPR can identify potential environmental impacts and risks of this project.
  2. Environmental Impact Assessment has notbeen done and shared with the people. This Assessment can examine the social and environmental consequences of the RRR Expressway project prior to execution. It can provide information to decision makers and the public about the environmental implications of proposed actions before decisions are made.
  3. Comprehensive relief and rehabilitation policy and plan have been developed by the Telangana government, with regard to land acquisition in general and in the case of RRR, in particular. This policy should enable and accelerate financing for activities that utilize nature-centric solutions, green infrastructure, and other approaches that restore and enhance natural resources and ecosystems. Experience in Telangana in the recent past shows that involuntary resettlement can give rise to severe economic, social, and environmental risks, and result in long-term hardship and impoverishment of affected people. A policy, which incorporates safeguards, has to call for meaningful consultation with affected people; facilitate mechanisms of compensation of losses and provision of assistance to and benefit sharing with displaced families, and special measures for the poor and vulnerable. This policy and concomitant measures require the preparation, implementation, and monitoring of time-bound resettlement plans.
  4. Government should aim to avoid involuntary resettlement wherever possible. It should strive to minimize involuntary resettlement by exploring alternatives to the project and project design. The Government has the responsibility to enhance, or at least restore, the livelihoods of all displaced persons in real terms relative to pre-project levels. Relief and rehabilitation should be designed to improve the standards of living of the displaced poor and other vulnerable groups.
  5. Land Acquisition Act, 2013, should be applied whenever land acquisition is being made. And, not the State Act of Land acquisition, 2017, which is discriminatory, limited and non-comprehensive. Land registration rates have to be revised based on established laws and procedures. Land acquisition, if at all, has to be based on these two conditions: applicability of central law and revision of land registered values to reflect market rates.
  6. Environment Mitigation Plan is developed with sufficient funds allocated and an institutional accountability hierarchy is defined. This can prescribe the environmental management strategy to be implemented by the project developers. Compensatory afforestation is only a one-dimensional approach that has failed to mitigate road project impacts on environment, ecology, watershed and catchment areas of water bodies.
  7. The Telangana government needs to devise a streamlined decision-making procedure, with each step having a defined transparent timeline and content so as not to permit exploitation of the poor, and clearly established measures for reaching consensus among stakeholders.
  8. RRR requires specific, visible and accessible grievance redressal mechanism. Union government and Telangana government need to establish such a mechanism.
  9. To ensure the environmental soundness and sustainability of this RRR project (as also other road projects), environmental safeguards have to be developed. Environmental considerations have to be integrated into the project decision-making process.
While RRR is not required under the current conditions and circumstances, the government should not to go ahead without fulfilling the above steps.
---
*Based on the author's representation to Nitin Gadkari, Minister of Road Transport and Highways, Government of India, with copy to Telengana government officials

Comments

Unknown said…
I fully support the views expressed. Noone is listening to various appeals made. There is no accountability. Anyone you ask they say they can't do anything, design is coming from above. I would like to reach to author to discuss about the options for the sufferers of this project. Please can you email me back. I would.like to get some advise from you on our next steps. Arul arulkata@gmail.com

TRENDING

Advocacy group decries 'hyper-centralization' as States’ share of health funds plummets

By A Representative   In a major pre-budget mobilization, the Jan Swasthya Abhiyan (JSA), India’s leading public health advocacy network, has issued a sharp critique of the Union government’s health spending and demanded a doubling of the health budget for the upcoming 2026-27 fiscal year. 

Iswar Chandra Vidyasagar’s views on religion as Tagore’s saw them

By Harasankar Adhikari   Religion has become a visible subject in India’s public discourse, particularly where it intersects with political debate. Recent events, including a mass Gita chanting programme in Kolkata and other incidents involving public expressions of faith, have drawn attention to how religion features in everyday life. These developments have raised questions about the relationship between modern technological progress and traditional religious practice.

Stands 'exposed': Cavalier attitude towards rushed construction of Char Dham project

By Bharat Dogra*  The nation heaved a big sigh of relief when the 41 workers trapped in the under-construction Silkyara-Barkot tunnel (Uttarkashi district of Uttarakhand) were finally rescued on November 28 after a 17-day rescue effort. All those involved in the rescue effort deserve a big thanks of the entire country. The government deserves appreciation for providing all-round support.

Delhi Jal Board under fire as CAG finds 55% groundwater unfit for consumption

By A Representative   A Comptroller and Auditor General (CAG) of India audit report tabled in the Delhi Legislative Assembly on 7 January 2026 has revealed alarming lapses in the quality and safety of drinking water supplied by the Delhi Jal Board (DJB), raising serious public health concerns for residents of the capital. 

Election bells ringing in Nepal: Can ousted premier Oli return to power?

By Nava Thakuria*  Nepal is preparing for a national election necessitated by the collapse of KP Sharma Oli’s government at the height of a Gen Z rebellion (youth uprising) in September 2025. The polls are scheduled for 5 March. The Himalayan nation last conducted a general election in 2022, with the next polls originally due in 2027.  However, following the dissolution of Nepal’s lower house of Parliament last year by President Ram Chandra Poudel, the electoral process began under the patronage of an interim government installed on 12 September under the leadership of retired Supreme Court judge Sushila Karki. The Hindu-majority nation of over 29 million people will witness more than 3,400 electoral candidates, including 390 women, representing 68 political parties as well as independents, vying for 165 seats in the 275-member House of Representatives.

Pairing not with law but with perpetrators: Pavlovian response to lynchings in India

By Vikash Narain Rai* Lynch-law owes its name to James Lynch, the legendary Warden of Galway, Ireland, who tried, condemned and executed his own son in 1493 for defrauding and killing strangers. But, today, what kind of a person will justify the lynching for any reason whatsoever? Will perhaps resemble the proverbial ‘wrong man to meet at wrong road at night!’

Zhou Enlai: The enigmatic premier who stabilized chaos—at what cost?

By Harsh Thakor*  Zhou Enlai (1898–1976) served as the first Premier of the People's Republic of China (PRC) from 1949 until his death and as Foreign Minister from 1949 to 1958. He played a central role in the Chinese Communist Party (CCP) for over five decades, contributing to its organization, military efforts, diplomacy, and governance. His tenure spanned key events including the Long March, World War II alliances, the founding of the PRC, the Korean War, and the Cultural Revolution. 

Jayanthi Natarajan "never stood by tribals' rights" in MNC Vedanta's move to mine Niyamigiri Hills in Odisha

By A Representative The Odisha Chapter of the Campaign for Survival and Dignity (CSD), which played a vital role in the struggle for the enactment of historic Forest Rights Act, 2006 has blamed former Union environment minister Jaynaynthi Natarjan for failing to play any vital role to defend the tribals' rights in the forest areas during her tenure under the former UPA government. Countering her recent statement that she rejected environmental clearance to Vendanta, the top UK-based NMC, despite tremendous pressure from her colleagues in Cabinet and huge criticism from industry, and the claim that her decision was “upheld by the Supreme Court”, the CSD said this is simply not true, and actually she "disrespected" FRA.

Uttarakhand tunnel disaster: 'Question mark' on rescue plan, appraisal, construction

By Bhim Singh Rawat*  As many as 40 workers were trapped inside Barkot-Silkyara tunnel in Uttarkashi after a portion of the 4.5 km long, supposedly completed portion of the tunnel, collapsed early morning on Sunday, Nov 12, 2023. The incident has once again raised several questions over negligence in planning, appraisal and construction, absence of emergency rescue plan, violations of labour laws and environmental norms resulting in this avoidable accident.