Skip to main content

Why Jhabua power plant is unable to eliminate 'dangerous' fly ash reserves

By Deepmala Patel* 

Avantha Power and Infrastructure had promised to provide employment to the people living in the area when the Jhabua power plant was commissioned. Although it is currently owned by the National Thermal Power Corporation (NTPC), this power plant which promised development in the area is wreaking havoc. The toxic ash coming out of the Jhabua power plant has been illegally dumped in the fields of tribal farmers of Gorakhpur, Barela, Umarpani and Bineki of Ghansor development block of Seoni district of Madhya Pradesh for more than two years. Despite all the complaints, the dangerous ash is destroying the farmers’ fields and their crops.
Last year, NTPC had signed a written contract to dump ash on the land of farmers of Khud and Khutatal villages, but the matter of dumping ash on the farmers’ fields did not stop here. In 2022, the power plant management again signed another contract with some farmers of Umarpani village and the work of removing gravel and soil from their fields and filling the ash there was done till June 2023. 
This deadline was extended by the management till June 2024, but this year the ash is being dumped in the fields of the farmers of Umarpani, Bhattekhari and Rajgarhi villages without making an agreement with them. The management is dumping the poisonous ash coming out of the plant in the fields of 20–22 farmers of these villages. For this, the farmers protested by staging a dharna in front of the Sub Divisional Magistrate, but no action was taken. Other farmers of the tribal community of the area are upset that this dangerous ash will be suddenly filled in their fertile fields without any information. 
If remedial measures are not taken soon on this problem, then this poisonous ash will flow into the rivers, drains, ponds and nearby fields in the coming rainy season and contaminate them. Scientists of the State Pollution Control Board and environmental experts are constantly expressing concern that if the fly ash stock is not disposed of safely, then the danger to the environment will increase further. This ash, along with poisoning the water and environment, can also spread diseases like TB, asthma, lung infection, skin diseases and cancer among the people living here.
According to a report by Raj News Network, Bhavna Malgamat Tehsildar Ghansor said that the Naib Tehsildar has investigated the ash being dumped by Jhabua Thermal Power Plant in Umarpani and the investigation report has been submitted to the SDM. The SDM has also given the full report to the District Mining Officer, but no proper action has been taken on it till date. The local community is bearing the brunt of the indifference of the local administration.

Why was the Environmental Clearance changed

Initially, the Environmental Clearance stated that ‘no tribal land will be acquired for the power plant’ which was later removed by the Ministry’s corrigendum dated 22.12.2010. This is a convenient way to favour industries over people. The result is that today this ash is being dumped anywhere in the area. While the ash pond of the power plant is spread over 56.4 hectares, now the question arises that why is the management choosing the fertile land of tribal farmers for dumping the ash.
According to a report published in People’s Newspaper, Jhabua Thermal Power Plant has been violating the conditions of environmental clearance granted by the Ministry of Environment and Forests by storing ash for the last several years. The flying of this ash is adversely affecting the health of the nearby residents. 
In Madhya Pradesh, ash produced from 13 power plants is 15.1695 million tonnes. If this 5.5505 million tonnes i.e. 36.59% is being used
According to the local people, ever since the Jhabua Thermal Power Plant has been established in this area, the environmental balance of this area has been disturbed. Due to the flying of ash all around, the temperature of the area is also increasing. 
The dirty water of the power plant is being released into the local Godi drain adjacent to the power plant area and this drain is joining the Narmada River through the Pariyat drain, due to which the chemical-laden water of contaminated fly ash is getting mixed in the Narmada River. Drinking the contaminated water of this drain is adversely impacting the health of animals.

Ash management status

The assessment of the ash production and use status of the first half of the year 2022-23 released by the Central Electricity Authority (CEA) has been done on the basis of data received from thermal power stations. So it was found that in this report, in the status of 2022-23, 142.0653 million tonnes of ash is produced from 175 thermal power plants with a capacity of 20,5623.00 MW across the country. The central government claims that out of this, 111.6124 million tonnes of ash is being used. That is, 78.14 percent, which has been used much less than last year 2021-22. Talking about Madhya Pradesh, the ash produced from 13 power plants is 15.1695 million tonnes, but out of this only 5.5505 million tonnes i.e. 36.59% is being used. Whereas in Jhabua Thermal Power Plant having capacity of 600 MW, only 0.2470 million tons of ash has been used out of 0.5837 million tons, only 42.31 percent of the ash is being used.
Whereas according to the Ash Utilisation Notification 2021, there was a condition to use 100% of the ash generated from the power plant. Is the ash of the power plant being dumped in the fields of poor, tribal farmers to fulfil this condition? Despite lakhs of complaints by the local community to the administration and power plant management, the irresponsible behaviour of the administration is endangering the lives and means of employment of these tribal communities. Today, many questions are being raised on this silence of the administration.
---
*Source: Centre for Financial Accountability 

Comments

TRENDING

From algorithms to exploitation: New report exposes plight of India's gig workers

By Jag Jivan   The recent report, "State of Finance in India Report 2024-25," released by a coalition including the Centre for Financial Accountability, Focus on the Global South, and other organizations, paints a stark picture of India's burgeoning digital economy, particularly highlighting the exploitation faced by gig workers on platform-based services. 

'Condonation of war crimes against women and children’: IPSN on Trump’s Gaza Board

By A Representative   The India-Palestine Solidarity Network (IPSN) has strongly condemned the announcement of a proposed “Board of Peace” for Gaza and Palestine by former US President Donald J. Trump, calling it an initiative that “condones war crimes against children and women” and “rubs salt in Palestinian wounds.”

India’s road to sustainability: Why alternative fuels matter beyond electric vehicles

By Suyash Gupta*  India’s worsening air quality makes the shift towards clean mobility urgent. However, while electric vehicles (EVs) are central to India’s strategy, they alone cannot address the country’s diverse pollution and energy challenges.

Gig workers hold online strike on republic day; nationwide protests planned on February 3

By A Representative   Gig and platform service workers across the country observed a nationwide online strike on Republic Day, responding to a call given by the Gig & Platform Service Workers Union (GIPSWU) to protest what it described as exploitation, insecurity and denial of basic worker rights in the platform economy. The union said women gig workers led the January 26 action by switching off their work apps as a mark of protest.

Jayanthi Natarajan "never stood by tribals' rights" in MNC Vedanta's move to mine Niyamigiri Hills in Odisha

By A Representative The Odisha Chapter of the Campaign for Survival and Dignity (CSD), which played a vital role in the struggle for the enactment of historic Forest Rights Act, 2006 has blamed former Union environment minister Jaynaynthi Natarjan for failing to play any vital role to defend the tribals' rights in the forest areas during her tenure under the former UPA government. Countering her recent statement that she rejected environmental clearance to Vendanta, the top UK-based NMC, despite tremendous pressure from her colleagues in Cabinet and huge criticism from industry, and the claim that her decision was “upheld by the Supreme Court”, the CSD said this is simply not true, and actually she "disrespected" FRA.

Swami Vivekananda's views on caste and sexuality were 'painfully' regressive

By Bhaskar Sur* Swami Vivekananda now belongs more to the modern Hindu mythology than reality. It makes a daunting job to discover the real human being who knew unemployment, humiliation of losing a teaching job for 'incompetence', longed in vain for the bliss of a happy conjugal life only to suffer the consequent frustration.

Over 40% of gig workers earn below ₹15,000 a month: Economic Survey

By A Representative   The Finance Minister, Nirmala Sitharaman, while reviewing the Economic Survey in Parliament on Tuesday, highlighted the rapid growth of gig and platform workers in India. According to the Survey, the number of gig workers has increased from 7.7 million to around 12 million, marking a growth of about 55 percent. Their share in the overall workforce is projected to rise from 2 percent to 6.7 percent, with gig workers expected to contribute approximately ₹2.35 lakh crore to the GDP by 2030. The Survey also noted that over 40 percent of gig workers earn less than ₹15,000 per month.

Stands 'exposed': Cavalier attitude towards rushed construction of Char Dham project

By Bharat Dogra*  The nation heaved a big sigh of relief when the 41 workers trapped in the under-construction Silkyara-Barkot tunnel (Uttarkashi district of Uttarakhand) were finally rescued on November 28 after a 17-day rescue effort. All those involved in the rescue effort deserve a big thanks of the entire country. The government deserves appreciation for providing all-round support.

Death behind locked doors in East Kolkata: A fire that exposed systemic neglect

By Atanu Roy*  It was Sunday at midnight. Around 30 migrant workers were in deep sleep after a hard day’s work. A devastating fire engulfed the godown where they were sleeping. There was no escape route for the workers, as the door was locked and no firefighting system was installed. Rules of the land were violated as usual. The fire continued for days, despite the sincere efforts of fire brigade personnel. The bodies were charred in the intense heat and were beyond identification, not fit for immediate forensic examination. As a result, nobody knows the exact death toll; estimates are hovering around 21 as of now.