Skip to main content

On-site slum upgradation in Ahmedabad: Solution of land tenure is the key

By Rajiv Shah 
Even as the Gujarat government is planning to come up with a new slum policy 2013, with “rehabilitation” of the slum-dwellers with the help of private developers as the key thrust, available literature suggests that any effort to uproot slum dwellers would mean further heightening their already vulnerable status.
Recently, in a paper, “Low Carbon Green Growth Roadmap for Asia and the Pacific”, providing a roadmap for citywide slum upgradation, United Nations Economic and Social Commission for Asia and the Pacific (UNESCAP) said that “the poor and the vulnerable in cities and towns can aspire to have security, shelter, basic infrastructure and services with citywide slum upgrading”, adding, “Up to 35 per cent of Asia-Pacific urban residents in slums with proper urban planning can have adequate shelter and basic services through proper urban planning.”
UNESCAP believes, this would be possible, only in case of “on-site slum upgrading” which would “mean improving the physical, social, economic and environmental conditions of an existing informal settlement – without displacing the people who live there.” It emphasizes, “Upgrading informal communities is the least expensive and most humane way of improving a city’s much-needed stock of affordable housing rather than destroying it. Unlike resettlement, upgrading causes minimal disturbance to people’s lives and to the delicate networks of mutual support in poor communities.”
Suggesting how it should happen, the paper says, “Urban poor groups take an active role in savings, surveying, planning and working with city authorities to make large-scale citywide upgrading possible. This is happening in more than ten Asian countries and represents an important shift in the role of the urban poor in improving their land and housing situation. Underpinning this, new financial systems linking community savings into larger city and national development funds allow the upgrading to materialize. The emphasis is on flexible financing, giving community groups the freedom to plan, to implement and to use the available funds to solve their housing and land problems
The argument for “on-site slum upgradation” has found favour in another study, “Housing Solutions: A Review of Models”, by Pratika Hingorani, prepared for the Indian Institute for Human Settlements (IIHS). Referring to how this was successfully carried out in Ahmedabad, the study says, slum network partnership (SNP) is “more successful model of slum upgradation” as it created a “unique partnership between local government, NGOs, private industry and slum communities to design, finance and implement slum upgrading projects”.
The aim in Ahmedabad was to “improve linkages with citywide infrastructure and services”, and the objectives included “improve the physical and non-physical infrastructure facilities within selected slum areas; to facilitate the process of community development; and to develop a city-level organization for slum networking and infrastructure.” In the first phase, SNP was undertaken as a three-way partnership (40-30-30) between Ahmedabad Municipal Corporation, a local private sector textile firm Arvind Mills (acting through their Sharda trust), and the slum communities themselves. “The NGOs, SAATH and SEWA’s Mahila Housing Trust that had a history of working in the communities were also key partners and provided micro financing facilities in addition to other community mobilization efforts. The approximate upgrading cost of Rs 3,000 per dwelling unit was shared by the parties as above, with slum dwellers able to take loans from SEWA and SAATH in order to make contribution.”
In order to encourage slum dwellers to continue to invest in their homes, the AMC agreed to “extend written assurance for a 10 year secure tenure to households participating in their programme.” This proved crucial. Though the Arvind Mills pulled out, between 1996 and 2005, SNP upgraded 8,400 dwelling units – serving an estimated 39,000 people. Funded as an 80:20 AMC-slum community split, it focused on infrastructure provisions – e.g. individual taps, bathrooms, street lighting and paved roads, apart from public health. The author comments, “The project has been widely regarded as a success and as recognition of the attempts and investments of the poor to enter the formal housing market.”
Yet, it threw up issues related with not just private sector participation, but tenure. Pointing towards the need to solve the latter problem urgently in case such an experiment has to succeed, the author underlines, “The issue of tenure is not always clearcut depending on the nature of land ownership in the city or state… About 75 per cent of Ahmedabad slums are located on private lands that were actually sold to slum dwellers many years ago. However, many of those private owners now deny that the sale as a result of which there are a multiplicity of landowners and claims.”
Though the slum dwellers who participated in SNP were encouraged to invest in their house by guaranteeing that they would not be evicted by providing a secure tenure of a decade, the fear of eviction hung on their head. Thus, the author quotes how power connections were provided by the electricity company only after the households signed an “indemnity bond that they will not pursue legal proceedings” against the company if they were “evicted or relocated from their homes.”
It has been found that securing tenure and community participation alone can prove crucial for any slum upgradation programme. Experts cite the Baan Mandong (secure housing) project in Thailand, in this context, which is being implemented since 2003 across the country. “The programme has led to upgraded housing conditions for more than 90,000 households with low-interest government loans, through the Community Organizations Development Institute (CODI)”, says UNESCAP.
Under the Baan Mandong project, points out the IIHS study by Pritika Hingorani, “infrastructure subsidies and money for soft loans” were channeled through the slum communities. “Communities are responsible for managing their won budget through which they must finance infrastructure and shelter upgrades and secure land tenures themselves”, she underlines, adding, “This is a radical change in thinking from previous programmes – whether public housing programmes, slum upgrading or sites and services projects – where responsibility for making land available rested squarely with the government.” It helped counter the “argument often put forth – that there is no urban land in central locations in particular, on which to house the poor.”
The tenure issue was solved like this: For a slum community to be eligible to participate, they must first set up a savings and credit group in which all the residents must be members. The savings group would pool together community savings to supplement the external funds that would be received through the programme. Next, community cooperatives would be established to act as the collective legal entity in whose name the land should be acquired, and who will receive the subsidies, loans and other funds.
Thus, slum communities, acting through their community groups were responsible for finding the land on which secure tenure can be obtained. This land could be all or a portion of the land they occupied, or an alternative site, and could be public or private land. Negotiations would then ensue to determine the type of tenure – for example, leasehold, freehold – that the slum communities would have, and the price at which this will be obtained.
CODI would then loan the money for this transaction to the community at a subsidized interest rate. Loans would subject to a cap usually determined on a per household basis. CODI also would loan money for shelter upgradation to community groups who they further lend the money to their members, at a slightly higher rate of interest. “Using this method more than 90 per cent of the communities in the programme have managed to get substantially more secure tenure than before. Once tenure is secured, infrastructure subsidies from national and local government help pay for the cost of internal and connecting infrastructure to the site”, the IIHS study underlines.
There is a strong view among those who have worked with slum dwellers that this type of approach could have been suitable in Ahmedabad and other Indian cities, and the SNP was in fact moving in that direction alone. The urgency of it remains even today, as the IIHS study underlines, “As part of the 2006-12 City Development Plan for Ahmedabad, it was noted that 32.4 per cent of the city’s population still lived in slums. A significant portion of these families was below the poverty line. Moreover, slums were treated as separate entities in the city, without any linkages to the main city or its infrastructure.”
However, “State of Asian Cities 2010/11” a report jointly prepared by UNESCAP and UNHABITAT, suggests how failure to go ahead with slum upgradation in Ahmedabad led to continuance of poor living conditions in Ahmedabad’s slums. Schemes such as Baan Mandong in Bangkok showed “that a citywide slum upgrading approach” became “effective”. This was against the “piecemeal, project based improvement of a few slums” in Ahmedabad. Ahmedabad’s slum networking programme, designed to take in all the slums in the city, remained a pilot project. No doubt, civil society took care of community mobilization and development while municipal authorities acted as facilitators by severing the link between tenure status and service provision by issuing ‘no-objection certificates’ which enable those who reside in houses of less than 25 sq. m. to connect to the water network.
Even then, things did not develop any further. The UNESCAP-UNHABITAT study says, “Poor quality of shelter, where any at all, poses a major threat to health in urban slums. Compelling evidence links various communicable and non-communicable diseases, injuries and psychosocial disorders to the risk factors inherent to unhealthy living conditions, such as faulty buildings, defective water supplies, substandard sanitation, poor fuel quality and ventilation, lack of refuse storage and collection, or improper food and storage preparation, as well as poor/unsafe locations, such as near traffic hubs, dumpsites or polluting industrial sites…”
It adds, “The result is that in Ahmedabad, for instance, infant mortality rates are twice as high in slums as the national rural average. Slum children under five suffer more and die more from diarrhoea or acute respiratory infections than those in rural areas. On average, slum children in Ahmedabad are more undernourished than the average in the whole of Gujarat state.”
---
To read how successful was the now-abandoned integrated slum development project of Ahmedabad, please click HERE

Comments

TRENDING

Budget for 2018-19: Ahmedabad authorities "regularly" under-spend allocation

By Mahender Jethmalani* The Ahmedabad Municipal Corporation’s (AMC's) General Body (Municipal Board) recently passed the AMC’s annual budget estimates of Rs 6,990 crore for 2018-19. AMC’s revenue expenditure for the next financial year is Rs 3,500 crore and development budget (capital budget) is Rs 3,490 crore.

History, culture and literature of Fatehpur, UP, from where Maulana Hasrat Mohani hailed

By Vidya Bhushan Rawat*  Maulana Hasrat Mohani was a member of the Constituent Assembly and an extremely important leader of our freedom movement. Born in Unnao district of Uttar Pradesh, Hasrat Mohani's relationship with nearby district of Fatehpur is interesting and not explored much by biographers and historians. Dr Mohammad Ismail Azad Fatehpuri has written a book on Maulana Hasrat Mohani and Fatehpur. The book is in Urdu.  He has just come out with another important book, 'Hindi kee Pratham Rachna: Chandayan' authored by Mulla Daud Dalmai.' During my recent visit to Fatehpur town, I had an opportunity to meet Dr Mohammad Ismail Azad Fatehpuri and recorded a conversation with him on issues of history, culture and literature of Fatehpur. Sharing this conversation here with you. Kindly click this link. --- *Human rights defender. Facebook https://www.facebook.com/vbrawat , X @freetohumanity, Skype @vbrawat

New RTI draft rules inspired by citizen-unfriendly, overtly bureaucratic approach

By Venkatesh Nayak* The Department of Personnel and Training , Government of India has invited comments on a new set of Draft Rules (available in English only) to implement The Right to Information Act, 2005 . The RTI Rules were last amended in 2012 after a long period of consultation with various stakeholders. The Government’s move to put the draft RTI Rules out for people’s comments and suggestions for change is a welcome continuation of the tradition of public consultation. Positive aspects of the Draft RTI Rules While 60-65% of the Draft RTI Rules repeat the content of the 2012 RTI Rules, some new aspects deserve appreciation as they clarify the manner of implementation of key provisions of the RTI Act. These are: Provisions for dealing with non-compliance of the orders and directives of the Central Information Commission (CIC) by public authorities- this was missing in the 2012 RTI Rules. Non-compliance is increasingly becoming a major problem- two of my non-compliance cases are...

Celebrating 125 yr old legacy of healthcare work of missionaries

Vilas Shende, director, Mure Memorial Hospital By Moin Qazi* Central India has been one of the most fertile belts for several unique experiments undertaken by missionaries in the field of education and healthcare. The result is a network of several well-known schools, colleges and hospitals that have woven themselves into the social landscape of the region. They have also become a byword for quality and affordable services delivered to all sections of the society. These institutions are characterised by committed and compassionate staff driven by the selfless pursuit of improving the well-being of society. This is the reason why the region has nursed and nurtured so many eminent people who occupy high positions in varied fields across the country as well as beyond. One of the fruits of this legacy is a more than century old iconic hospital that nestles in the heart of Nagpur city. Named as Mure Memorial Hospital after a British warrior who lost his life in a war while defending his cou...

Licy Bharucha’s pilgrimage into the lives of India’s freedom fighters

By Moin Qazi* Book Review: “Oral History of Indian Freedom Movement”, by Dr Licy Bharucha; Pp240; Rs 300; Published by National Museum of Indian Freedom Movement The Congress has won political freedom, but it has yet to win economic freedom, social and moral freedom. These freedoms are harder than the political, if only because they are constructive, less exciting and not spectacular. — Mahatma Gandhi The opening quote of the book by Mahatma Gandhi sums up the true objective of India’s freedom struggle. It also in essence speaks for the multitudes of brave and courageous individuals who aspired to get themselves jailed for the cause of the country’s freedom. A jail term was a strong testimony and credential of patriotism for them. The book has been written by Dr Licy Bharucha, an academically trained political scientist and a scholar of peace studies and Gandhian studies, who was closely associated throughout her life with those who made the struggle for India’s independence the primar...

Urgent need to study cause of large number of natural deaths in Gulf countries

By Venkatesh Nayak* According to data tabled in Parliament in April 2018, there are 87.76 lakh (8.77 million) Indians in six Gulf countries, namely Bahrain, Kuwait, Oman, Qatar, Saudi Arabia and the United Arab Emirates (UAE). While replying to an Unstarred Question (#6091) raised in the Lok Sabha, the Union Minister of State for External Affairs said, during the first half of this financial year alone (between April-September 2018), blue-collared Indian workers in these countries had remitted USD 33.47 Billion back home. Not much is known about the human cost of such earnings which swell up the country’s forex reserves quietly. My recent RTI intervention and research of proceedings in Parliament has revealed that between 2012 and mid-2018 more than 24,570 Indian Workers died in these Gulf countries. This works out to an average of more than 10 deaths per day. For every US$ 1 Billion they remitted to India during the same period there were at least 117 deaths of Indian Workers in Gulf ...

UP tribal woman human rights defender Sokalo released on bail

By  A  Representative After almost five months in jail, Adivasi human rights defender and forest worker Sokalo Gond has been finally released on bail.Despite being granted bail on October 4, technical and procedural issues kept Sokalo behind bars until November 1. The Citizens for Justice and Peace (CJP) and the All India Union of Forest Working People (AIUFWP), which are backing Sokalo, called it a "major victory." Sokalo's release follows the earlier releases of Kismatiya and Sukhdev Gond in September. "All three forest workers and human rights defenders were illegally incarcerated under false charges, in what is the State's way of punishing those who are active in their fight for the proper implementation of the Forest Rights Act (2006)", said a CJP statement.

Sardar Patel was on Nathuram Godse's hit list: Noted Marathi writer Sadanand More

Sadanand More (right) By  A  Representative In a surprise revelation, well-known Gujarati journalist Hari Desai has claimed that Nathuram Godse did not just kill Mahatma Gandhi, but also intended to kill Sardar Vallabhbhai Patel. Citing a voluminous book authored by Sadanand More, “Lokmanya to Mahatma”, Volume II, translated from Marathi into English last year, Desai says, nowadays, there is a lot of talk about conspiracy to kill Gandhi, Netaji Subhas Chandra Bose, and Shyama Prasad Mukherjee, but little is known about how the Sardar was also targeted.

Uttarakhand tunnel disaster: 'Question mark' on rescue plan, appraisal, construction

By Bhim Singh Rawat*  As many as 40 workers were trapped inside Barkot-Silkyara tunnel in Uttarkashi after a portion of the 4.5 km long, supposedly completed portion of the tunnel, collapsed early morning on Sunday, Nov 12, 2023. The incident has once again raised several questions over negligence in planning, appraisal and construction, absence of emergency rescue plan, violations of labour laws and environmental norms resulting in this avoidable accident.