Skip to main content

Uttarakhand tragedy: How govt 'ignored' dam reports, warning from environmentalists

By Vimal Bhai* 

Uttarakhand again witnessed a catastrophe. Local residents of Raini village, goat grazing herders and labourers working in the (13.5 MW) Rishi Ganga Power Project have been declared dead or missing in the sudden flood in Rishi Ganga in Chamoli district.
After that, the deluge reached Dhauliganga, destroyed the entire dam of Tapovan Vishnugad's power project (520 MW) and filled the debris and silt in the tunnels leading to the power house. The workers employed in the tunnel of this project are still missing. Some dead bodies have been found and many more are still missing. The exact number of people killed and missing is not clear yet.
On the other hand, the number of people who were actually killed will never be revealed because the authorities will only talk about the registered labours. There is no record of the number of small contractors involved and how many people were working with them. Till date, there is no complete record of the missing and killed people in the disaster of June 2013.
The nature is being blamed for the whole incident. The news of breaking glaciers is being widely publicized but there is no statement or discussion on the delicate ecology of the Himalayas for the creation of such large projects, the use of uncontrolled explosives, cutting down of forests, and complete neglect of environmental laws and regulations.
Governments have so far ignored dam reports, warnings from environmentalists, warnings of nature. Being situated in the central Himalayas, Uttarakhand state is full of natural beauty, but at the same time there is always the risk of natural disasters. Constant tampering with nature makes such disaster more frightening.
The loss of life and property due to the so-called glacier rupture incident of February 7, 2021 would have been bare minimal, if these two mega dams were not constructed. Governments should see that it is because of these projects that laborers and other workers, residents of the village and Bakarwal have been killed. 
The people of Raini village constantly raised the issue of excessive use of explosives for construction of projects. Villagers also went to the Uttarakhand High Court and the court gave the responsibility to the District Magistrate.
We at Matu Jansangthan also challenged the environmental clearance of the Tapovan-Vishnugad project in the then "National Environmental Appellate Authority", which was cancelled by the Authority on the issue of filing this appeal after the deadline. Even after this, we kept raising all the issues related to the environment, but the government never paid any attention. We believe that the local administration, the concerned departments of Uttarakhand state and the Union Ministry of Environment, Forests and Climate Change (MoEFCC) are responsible for the environmental violations in both projects.
Former chief minister of Uttarakhand late Narayan Dutt Tiwari said after the Tehri Dam that no such big dam will be built in future. Despite that the public hearing of Pancheshwar and Rupali Gad dam on Mahakali River were held in 2017 with full deception. The government is moving forward with a large Kishau dam on the Tons River. It is an invitation to another direct disaster.
The impact of so-called glacier rupture incident of February 7 would have been bare minimal, if two mega dams were not constructed
After the June 2013 disaster, the Supreme Court, in the case of "Alaknanda Hydro Power Company Limited v. Anuj Joshi and others", took cognizance of the Uttarakhand disaster and ordered the central and state government not to sanction any dam project in Uttarakhand. And the Government should assess the impact of hydropower projects on the rivers.
MoEFCC limited the order of the Supreme Court to some rivers of Ganges. The Supreme Court never held MoEFCC accountable for limiting its order. The committee headed by Ravi Chopra recommended stoppage of 23 out of 24 projects stated in the 2012 report of Wildlife Institute of India, Dehradun. But the Supreme Court stayed all the 24 projects.
After this, MoEFCC formed a new committee and recommended that six of the 24 major projects be taken forward. The Central Electricity Authority also formed a committee.
But the joint affidavit from the Ministry of Jal Shakti, Power Ministry and MoEFCC which was to be filed in the Supreme Court has not been furnished till date. The Supreme Court has not held any hearing for a long time. The Supreme Court is guilty of not hearing such a significant and critical case related to climate change and killings of people. Therefore, the Supreme Court is also responsible for this accident.
Whereas in 2016, the then Power Minister Piyush Goyal had said that we are producing more electricity than required. According to government data, if the current power projects also produce 70 to 75%, then we have no need for new projects. Then what is the need of such projects in such sensitive areas of the Himalayas? 
It is also a matter of fact that rehabilitation and environmental conditions have not been fulfilled literally even in a single dam project in Uttarakhand. The same has happened here. Dams change the natural calamity of any river into a formidable form. The Ravi Chopra Committee mentioned this clearly in its report.
We have many such examples in the June 2013 disaster. If the Vishnuprayag dam built on the Alaknanda River did not break, then the bridges below would not have brokn. Thousands of pilgrims of Badrinath ji and Hemkund Saheb would not have got stuck. Because of Srinagar dam on the same river, the government and non-government property of the lower area became submerged. People are still fighting for the compensation.
The government did not learn any lessons from the June, 2013 disaster. The Supreme Court has not taken any concrete steps on this till date.
Apart from Matu Janasangathan, Himalayan lovers and environmentalists of the Uttarakhand and the country warned the government in 2013 on the issue that such accidents can happen again, so big projects should be stopped.
  • Accountability of public representatives, policymakers, officers and government should be fixed on all these issues. They are the ones who lead these dams for so called ‘development’ and power.
  • Orders should be issued to furnish the complete records the labourers working in all projects.
---
*With Matu Jansangthan, a National Alliance of Peoples' Movements associate

Comments

TRENDING

From algorithms to exploitation: New report exposes plight of India's gig workers

By Jag Jivan   The recent report, "State of Finance in India Report 2024-25," released by a coalition including the Centre for Financial Accountability, Focus on the Global South, and other organizations, paints a stark picture of India's burgeoning digital economy, particularly highlighting the exploitation faced by gig workers on platform-based services. 

'Condonation of war crimes against women and children’: IPSN on Trump’s Gaza Board

By A Representative   The India-Palestine Solidarity Network (IPSN) has strongly condemned the announcement of a proposed “Board of Peace” for Gaza and Palestine by former US President Donald J. Trump, calling it an initiative that “condones war crimes against children and women” and “rubs salt in Palestinian wounds.”

Gig workers hold online strike on republic day; nationwide protests planned on February 3

By A Representative   Gig and platform service workers across the country observed a nationwide online strike on Republic Day, responding to a call given by the Gig & Platform Service Workers Union (GIPSWU) to protest what it described as exploitation, insecurity and denial of basic worker rights in the platform economy. The union said women gig workers led the January 26 action by switching off their work apps as a mark of protest.

India’s road to sustainability: Why alternative fuels matter beyond electric vehicles

By Suyash Gupta*  India’s worsening air quality makes the shift towards clean mobility urgent. However, while electric vehicles (EVs) are central to India’s strategy, they alone cannot address the country’s diverse pollution and energy challenges.

Jayanthi Natarajan "never stood by tribals' rights" in MNC Vedanta's move to mine Niyamigiri Hills in Odisha

By A Representative The Odisha Chapter of the Campaign for Survival and Dignity (CSD), which played a vital role in the struggle for the enactment of historic Forest Rights Act, 2006 has blamed former Union environment minister Jaynaynthi Natarjan for failing to play any vital role to defend the tribals' rights in the forest areas during her tenure under the former UPA government. Countering her recent statement that she rejected environmental clearance to Vendanta, the top UK-based NMC, despite tremendous pressure from her colleagues in Cabinet and huge criticism from industry, and the claim that her decision was “upheld by the Supreme Court”, the CSD said this is simply not true, and actually she "disrespected" FRA.

Stands 'exposed': Cavalier attitude towards rushed construction of Char Dham project

By Bharat Dogra*  The nation heaved a big sigh of relief when the 41 workers trapped in the under-construction Silkyara-Barkot tunnel (Uttarkashi district of Uttarakhand) were finally rescued on November 28 after a 17-day rescue effort. All those involved in the rescue effort deserve a big thanks of the entire country. The government deserves appreciation for providing all-round support.

Whither space for the marginalised in Kerala's privately-driven townships after landslides?

By Ipshita Basu, Sudheesh R.C.  In the early hours of July 30 2024, a landslide in the Wayanad district of Kerala state, India, killed 400 people. The Punjirimattom, Mundakkai, Vellarimala and Chooralmala villages in the Western Ghats mountain range turned into a dystopian rubble of uprooted trees and debris.

Over 40% of gig workers earn below ₹15,000 a month: Economic Survey

By A Representative   The Finance Minister, Nirmala Sitharaman, while reviewing the Economic Survey in Parliament on Tuesday, highlighted the rapid growth of gig and platform workers in India. According to the Survey, the number of gig workers has increased from 7.7 million to around 12 million, marking a growth of about 55 percent. Their share in the overall workforce is projected to rise from 2 percent to 6.7 percent, with gig workers expected to contribute approximately ₹2.35 lakh crore to the GDP by 2030. The Survey also noted that over 40 percent of gig workers earn less than ₹15,000 per month.

Fragmented opposition and identity politics shaping Tamil Nadu’s 2026 election battle

By Syed Ali Mujtaba*  Tamil Nadu is set to go to the polls in April 2026, and the political battle lines are beginning to take shape. Prime Minister Narendra Modi’s visit to the state on January 23, 2026, marked the formal launch of the Bharatiya Janata Party’s campaign against the ruling Dravida Munnetra Kazhagam (DMK). Addressing multiple public meetings, the Prime Minister accused the DMK government of corruption, criminality, and dynastic politics, and called for Tamil Nadu to be “freed from DMK’s chains.” PM Modi alleged that the DMK had turned Tamil Nadu into a drug-ridden state and betrayed public trust by governing through what he described as “Corruption, Mafia and Crime,” derisively terming it “CMC rule.” He claimed that despite making numerous promises, the DMK had failed to deliver meaningful development. He also targeted what he described as the party’s dynastic character, arguing that the government functioned primarily for the benefit of a single family a...