Skip to main content

Don't allow water levels in Narmada dam to reach beyond 127 metres: NBA to Modi


By A Representative
In an open letter to Prime Minister Narendra Modi, the Narmada Bachao Andolan (NBA) has alleged that even though resettlement of 244 villages and one town is pending, and 32,000 families are still residing in the submergence area of ​​the Sardar Sarovar dam, the rehabilitation of oustees remains incomplete.
Asserting that a whopping 16,000 families were removed from the list of those affected by submergence following a "review" of backwater levels in 2008-2010, the NBA letter, signed among others by senior social activist Medha Patkar, said, many of their houses were submerged in 2013, suggesting the reassessment was totally wrong.
The letter said, as on May 27, 2019 the Chief Secretary of Madhya Pradesh admitted in a letter to the Narmada Control Authority (NCA), that 8,300 cases are pending with the Grievances Redressal Authority (GRA), responsible for adjudicating complaints of the dam oustees, while in 2,952 cases, eligibility for alternative land has not been been completed.
Asserting that thousands of houses, lakhs of big trees, government buildings, cultural, religious places will be drowned if the water in water levels reach the full reservoir level, 138.68 meters, NBA said, already water levels have reached 131.18 meters (which was approved by NCA for August 12), demanding, the level shouldn't go beyond 127 meters.
The letter regretted, currently NCA is controlled by NK Sinha, who does not have the ability to accomplish the huge pending tasks concerning rehabilitation and environment, water planning, regulation and monitoring etc., as he an electrical engineering and has no expertise on other issues. "He is playing Narmada's future", it added.

Comments

TRENDING

Gharapuri's discoveries: India finds a maritime past, ASI an app

By Gajanan Khergamker  The Archaeological Survey of India (ASI) has once again demonstrated an extraordinary talent for mistaking administrative housekeeping for institutional achievement. At the very moment excavations at Gharapuri are yielding evidence that could fundamentally reshape our understanding of India's maritime past, the institution has chosen to celebrate the rollout of QR-enabled audio guides and GPS-supported navigation at its monuments. The contrast could not be starker. 

Bihar’s land at ₹1 per acre for Adani sparks outrage, NAPM calls it crony capitalism

By A Representative   The National Alliance of People’s Movements (NAPM) has strongly condemned the Bihar government’s decision to lease 1,050 acres of land in Pirpainti, Bhagalpur district, to Adani Power for a 2,400 MW coal-based thermal power project. 

What's behind Columbia's president-elect speaking out against continuing the country’s peace agenda

By Laura Violeta Devia López  There are just over three weeks left before Abelardo De La Espriella takes office as Colombia’s new president, despite the numerous allegations that cast a shadow over his election and, as usual, discredit the Colombian electoral system. The announcements already being made by Abelardo and his designated cabinet mark a significant change of course, not only for the Colombian people but also for the country’s place in the world.