Skip to main content

Gujarat PSU faces fresh environmental hurdle in 'producing' gas off Andhra coast

By Rajiv Shah 
The Gujarat government’s powerful state public sector undertaking (PSU), Gujarat State Public Corporation (GSPC), has faced a major environmental hurdle, putting its Rs 2,030 crore project to go in for commercial production of the gas it claims to have found in the KG Basin, off Andhra coast, in jeopardy. Asking the GSPC to “defer” the project till certain conditions are fulfilled, sources in Gujarat’s energy and petrochemicals department said, the expert appraisal committee (EAC) of the Union ministry of environment and forests has refused to give blanket coastal regulatory zone (CRZ) clearance for laying down underground gas pipeline, optical fibre cable (OFC), an effluent disposal pipeline – all of which is proposed to pass through CRZ area of Yanam-Puducherry, along the Andhra Pradesh coast – as also the proposal to set up an onshore gas terminal off Mallavaram and a process-cum-living quarter platform at offshore in KG Basin, Andhra Pradesh.
The GSPC had argued that both these proposals were "component of a single project”, hence the EAC should consider all of it as a single project. The GSPC said, after “discovery” of gas in the Kakinada-Godavari (KG) basin’s block 8, GSPC had decided to develop the field as Deendayal Development Field. Environmental clearance from the Ministry of Environment and Forest (MoEF) was obtained for the field development, which consisted of setting up of well head platform (WHP) at offshore ( KG 8 location), drilling of 15 development wells from WHP, laying of multiphase produced fluid pipeline from offshore (WHP) to land fall point (LFP), and from LFP to onshore gas terminal (OGT) at Mallavaram, laying of pipeline for disposal of treated effluent from OGT at identified marine outfall location, and processing facilities for 240 million metric standard cubic feet per day (MMSCFT), and a condensate.
The EAC note, which refused the CRZ clearance, says, "Subsequently, with receipt of consent for establishment (CFE) from the State Pollution Control Board, physical construction work for the above field development commenced. In the mean time, with availability of additional well test data, capacities of some of the already envisaged facilities were required to be enhanced, and some new facilities were required to be added in the development scheme so that it continued to remain effective and optimum.”
It is against this backdrop that the GSPC submitted an application for obtaining CRZ clearance for process-cum-living quarter platform connected to WHP (with gas dehydration, produced water treatment, living quarter facility) located at offshore, apart from other facilities. The GSPC simultaneously asked for enhancement of processing capacity of onshore gas terminal (natural gas – 240 MMSCFD to 300 MMSCFD, of capacity of the captive power plant (from four to 24 MW), and “evacuation of process sale gas from OGT through sale gas pipeline to East West Pipeline (EWPL) of Reliance Gas Transportation Infrastructure Ltd (RGTIL)”, to quote from the EAC note.
The GSPC also wanted raw water pipeline (74 Km long) to draw raw water from the upstream of Dowlaiswaram barrage. “This proposal was considered by Andhra Pradesh state Coastal Zone Management Authority (APCZMA) on November 7, 2012 and recommended the project to MoEF”, the note said.
During the discussion on these issues, the note clarified, the GSPC was asked to submit: (1) details of the critical environmental issues identified during laying of pipeline, (2) environment clearance for enhancement of captive power plant, under consideration of environmental appraisal committee (EAC) of the thermal committee, which has also sought examining the requirement of wildlife clearance in view of Coringa Sanctuary located in 2.5 km distance, and (3) the plan of the pipeline to pass through the mangroves. “In view of the foregoing observations, the committee recommended to defer the proposal. The proposal shall be reconsidered after the above observations are addressed and submitted”, the top note said.
The EAC decision to ask the GSPC to defer its Rs 2030 crore worth of facilities comes after the Andhra Pradesh government took strong objection to the GSPC for failing to take necessary forest and wildlife clearances for its proposed facilities. It reportedly asked GSPC executives to “stop work” of laying down a crucial submarine pipeline to take gas from KG Basin to its onshore gas terminal (OGT) via an area which is 10 km of the Corianga sanctuary without necessary clearances. It asks them to explain “why action shouldn’t be taken” for violating forest and wildlife laws.
It is said, the GSPC “only took environmental clearance” and thought it was “enough.” After nearly two years, its top bosses found that environmental clearance was not enough, and that forest and wildlife clearance, under their respective Central laws, would also need to be taken, without which KG Basin gas cannot reach OGT. “Hectic preparations began to prepare papers”, a senior official said, adding, “The delay in failing to take necessary clearances will mean commercial production of KG Basin gas will have to be postponed by at least two years. ” The notice to “stop work” was delivered after GSPC failed to respond to two earlier warnings.
The work for the Rs 2,030 crore OGT was under progress at Mallavaram, and nearly 30 per cent of it had been complete. Under instructions of chief minister Narendra Modi, OGT it is said, was put on fast track, with the expectation that ahead of the Lok Sabha polls in 2014, GSPC would go into full-scale commercial operation. This would help neutralize some of the criticism being leveled against GSPC for creating hype around the KG operations, where instead of the prematurely announced 20 trillion cubic feet (tcf) of gas only 2 tcf was found. Nobody knows how of much of the 2 tcf is actually recoverable. Meanwhile, GSPC is search of a foreign partner who can help make maximum utilization of the KG gas.

Comments

TRENDING

MG-NREGA: A global model still waiting to be fully implemented

By Bharat Dogra  When the Mahatma Gandhi National Rural Employment Guarantee Act (MG-NREGA) was introduced in India nearly two decades ago, it drew worldwide attention. The reason was evident. At a time when states across much of the world were retreating from responsibility for livelihoods and welfare, the world’s second most populous country—with nearly two-thirds of its people living in rural or semi-rural areas—committed itself to guaranteeing 100 days of employment a year to its rural population.

A comrade in culture and controversy: Yao Wenyuan’s revolutionary legacy

By Harsh Thakor*  This year marks two important anniversaries in Chinese revolutionary history—the 20th death anniversary of Yao Wenyuan, and the 50th anniversary of his seminal essay "On the Social Basis of the Lin Biao Anti-Party Clique". These milestones invite reflection on the man whose pen ignited the first sparks of the Great Proletarian Cultural Revolution and whose sharp ideological interventions left an indelible imprint on the political and cultural landscape of socialist China.

Swami Vivekananda's views on caste and sexuality were 'painfully' regressive

By Bhaskar Sur* Swami Vivekananda now belongs more to the modern Hindu mythology than reality. It makes a daunting job to discover the real human being who knew unemployment, humiliation of losing a teaching job for 'incompetence', longed in vain for the bliss of a happy conjugal life only to suffer the consequent frustration.

Concerns raised over move to rename MGNREGA, critics call it politically motivated

By A Representative   Concerns have been raised over the Union government’s reported move to rename the Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA), with critics describing it as a politically motivated step rather than an administrative reform. They argue that the proposed change undermines the legacy of Mahatma Gandhi and seeks to appropriate credit for a programme whose relevance has been repeatedly demonstrated, particularly during times of crisis.

Rollback of right to work? VB–GRAM G Bill 'dilutes' statutory employment guarantee

By A Representative   The Right to Food Campaign has strongly condemned the passage of the Viksit Bharat – Guarantee for Rozgar and Ajeevika Mission (Gramin) (VB–GRAM G) Bill, 2025, describing it as a major rollback of workers’ rights and a fundamental dilution of the statutory Right to Work guaranteed under the Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA). In a statement, the Campaign termed the repeal of MGNREGA a “dark day for workers’ rights” and accused the government of converting a legally enforceable, demand-based employment guarantee into a centralised, discretionary welfare scheme.

Making rigid distinctions between Indian and foreign 'historically untenable'

By A Representative   Oral historian, filmmaker and cultural conservationist Sohail Hashmi has said that everyday practices related to attire, food and architecture in India reflect long histories of interaction and adaptation rather than rigid or exclusionary ideas of identity. He was speaking at a webinar organised by the Indian History Forum (IHF).

From jobless to ‘job-loss’ growth: Experts critique gig economy and fintech risks

By A Representative   Leading economists and social activists gathered in the capital on Friday to launch the third edition of the State of Finance in India Report 2024-25 , issuing a stark warning that the rapid digitalization of the Indian economy is eroding welfare systems and entrenching "digital dystopia." 

India’s Halal economy 'faces an uncertain future' under the new food Bill

By Syed Ali Mujtaba*  The proposed Food Safety and Standards (Amendment) Bill, 2025 marks a decisive shift in India’s food regulation landscape by seeking to place Halal certification exclusively under government control while criminalising all private Halal certification bodies. Although the Bill claims to promote “transparency” and “standardisation,” its structure and implications raise serious concerns about religious freedom, economic marginalisation, and the systematic dismantling of a long-established, Muslim-led Halal ecosystem in India.

School job scam and the future of university degree holders in West Bengal

By Harasankar Adhikari  The school recruitment controversy in West Bengal has emerged as one of the most serious governance challenges in recent years, raising concerns about transparency, institutional accountability, and the broader impact on society. Allegations that school jobs were obtained through irregular means have led to prolonged legal scrutiny, involving both the Calcutta High Court and the Supreme Court of India. In one instance, a panel for high school teacher recruitment was ultimately cancelled after several years of service, following extended judicial proceedings and debate.