Skip to main content

Will Govt of India set up land bank, ‘reclaim' wasteland to set up solar power projects?

By NS Venkataraman*

Acquiring land for setting up solar power projects is one of the biggest challenges for solar project developers in India. Solar power project require large track of land and the cost of land is critical in reducing the overall project costs. To set up solar power project of one megawatt capacity, around 6,000 square metre (around 1.5 acre) of land is required.
By end of December, 2023, India’s installed capacity for solar power was around 74 GW and around 45GW of wind power. With the target of achieving 500GW of renewable power projects by 2030, India has to increase the installed capacity of solar power projects multifold.
To ensure that India would be able to have high solar power installed capacity by 2030 commensurate with the target of 500 GW for renewable energy, it is absolutely necessary that land acquisition issue for solar power projects should be sorted out once for all.
In a densely populated country like India, acquisition of land for any purpose, whether industrial, commercial, infrastructure, mining or other purpose have been a formidable ticklish issue.
In several cases, agricultural land is being sought to be taken over for such projects and there have been severe public resistance for such proposals, as this uproots the life of the farmers and agriculturists who have been depending on the agricultural land for their earnings and livelihood.
Not surprisingly, there have been protests and opposition for such move to acquire agricultural land. A careful and dispassionate study and analysis of the above scenario would highlight the fact that the apprehensions and anxiety are genuine and cannot be ignored or taken for granted under any circumstances.
As a result, in the last decade, a number of proposed and prospective industrial and infrastructure projects have been shelved or heavily delayed due to the land acquisition issues in the country.

Need for land bank for solar power project

It is high time that the Government of India should create a comprehensive policy and approach to ensure adequate land availability for solar power projects, without disturbing the agricultural operations or upsetting the livelihood and economic conditions of people belonging to lower income group.
It is necessary, to carry out a detailed land audit all over India to identify surplus/ unused land, which have not been put to use for more than five years and such land can be acquired by the government to set up solar power . project.
Most of such sites would be suitable for setting up solar power project in view of the tropical conditions in most part of the country and most period of the year.
There are many sick industrial units in large, medium and small scale level,which are not in operation for several years and number of them may have large area of unused land.
Such land as well as acreage, buildings and other facilities belonging to thousands of industrial units of various sizes that fell sick and were closed, with little or no prospects of being reopened, can be used to set up solar power projects , instead of taking over farmland.
A 2015-16 study estimated that India had around 55.76 million hectares of wasteland (16.96 per cent of the country’s total area), including dense scrub, waterlogged marshy land, sandy areas, degraded pastures/ grazing land, alkaline and saline land, barren rocky areas etc. (Source: NRSC, ISRO, Dept. of Space & Department of Land Resources, Ministry of rural Development).
Such wasteland can be recovered and reclaimed and put to use for setting up solar power projects.

Pattern of waste land distribution

Further, there are many operating industrial units all over India, which have large tracts of surplus and unused land. Similarly, there are many educational institutions and universities which have much land which has remained unutilised for decades.
Central and state governments, as well as the Indian Railways own land, possibly running into several thousands of acres, which are not in use. In view of the land acquisition issues, solar power projects are facing crisis situation to move on in expanding the capacity and meeting the energy requirement of the country.
Unfortunately, no organised study has been initiated by government so far to assess the availability of such unused and waste land and the feasibility of putting them to use. It is high time that the government looks into the matter with high sense of urgency.
---
*Trustee, Nandini Voice for The Deprived, Chennai

Comments

TRENDING

Stronger India–Russia partnership highlights a missed energy breakthrough

By N.S. Venkataraman*  The recent visit of Russian President Vladimir Putin to India was widely publicized across several countries and has attracted significant global attention. The warmth with which Mr. Putin was received by Prime Minister Narendra Modi was particularly noted, prompting policy planners worldwide to examine the implications of this cordial relationship for the global economy and political climate. India–Russia relations have stood on a strong foundation for decades and have consistently withstood geopolitical shifts. This is in marked contrast to India’s ties with the United States, which have experienced fluctuations under different U.S. administrations.

From natural farming to fair prices: Young entrepreneurs show a new path

By Bharat Dogra   There have been frequent debates on agro-business companies not showing adequate concern for the livelihoods of small farmers. Farmers’ unions have often protested—generally with good reason—that while they do not receive fair returns despite high risks and hard work, corporate interests that merely process the crops produced by farmers earn disproportionately high profits. Hence, there is a growing demand for alternative models of agro-business development that demonstrate genuine commitment to protecting farmer livelihoods.

The Vande Mataram debate and the politics of manufactured controversy

By Vidya Bhushan Rawat*  The recent Vande Mataram debate in Parliament was never meant to foster genuine dialogue. Each political party spoke past the other, addressing its own constituency, ensuring that clips went viral rather than contributing to meaningful deliberation. The objective was clear: to construct a Hindutva narrative ahead of the Bengal elections. Predictably, the Lok Sabha will likely expunge the opposition’s “controversial” remarks while retaining blatant inaccuracies voiced by ministers and ruling-party members. The BJP has mastered the art of inserting distortions into parliamentary records to provide them with a veneer of historical legitimacy.

A comrade in culture and controversy: Yao Wenyuan’s revolutionary legacy

By Harsh Thakor*  This year marks two important anniversaries in Chinese revolutionary history—the 20th death anniversary of Yao Wenyuan, and the 50th anniversary of his seminal essay "On the Social Basis of the Lin Biao Anti-Party Clique". These milestones invite reflection on the man whose pen ignited the first sparks of the Great Proletarian Cultural Revolution and whose sharp ideological interventions left an indelible imprint on the political and cultural landscape of socialist China.

Thota Sitaramaiah: An internal pillar of an underground organisation

By Harsh Thakor*  Thota Sitaramaiah was regarded within his circles as an example of the many individuals whose work in various underground movements remained largely unknown to the wider public. While some leaders become visible through organisational roles or media attention, many others contribute quietly, without public recognition. Sitaramaiah was considered one such figure. He passed away on December 8, 2025, at the age of 65.

Epic war against caste system is constitutional responsibility of elected government

Edited by well-known Gujarat Dalit rights leader Martin Macwan, the book, “Bhed-Bharat: An Account of Injustice and Atrocities on Dalits and Adivasis (2014-18)” (available in English and Gujarati*) is a selection of news articles on Dalits and Adivasis (2014-2018) published by Dalit Shakti Prakashan, Ahmedabad. Preface to the book, in which Macwan seeks to answer key questions on why the book is needed today: *** The thought of compiling a book on atrocities on Dalits and thus present an overall Indian picture had occurred to me a long time ago. Absence of such a comprehensive picture is a major reason for a weak social and political consciousness among Dalits as well as non-Dalits. But gradually the idea took a different form. I found that lay readers don’t understand numbers and don’t like to read well-researched articles. The best way to reach out to them was storytelling. As I started writing in Gujarati and sharing the idea of the book with my friends, it occurred to me that while...

New RTI draft rules inspired by citizen-unfriendly, overtly bureaucratic approach

By Venkatesh Nayak* The Department of Personnel and Training , Government of India has invited comments on a new set of Draft Rules (available in English only) to implement The Right to Information Act, 2005 . The RTI Rules were last amended in 2012 after a long period of consultation with various stakeholders. The Government’s move to put the draft RTI Rules out for people’s comments and suggestions for change is a welcome continuation of the tradition of public consultation. Positive aspects of the Draft RTI Rules While 60-65% of the Draft RTI Rules repeat the content of the 2012 RTI Rules, some new aspects deserve appreciation as they clarify the manner of implementation of key provisions of the RTI Act. These are: Provisions for dealing with non-compliance of the orders and directives of the Central Information Commission (CIC) by public authorities- this was missing in the 2012 RTI Rules. Non-compliance is increasingly becoming a major problem- two of my non-compliance cases are...

Proposals for Babri Masjid, Ram Temple spark fears of polarisation before West Bengal polls

By A Representative   A political debate has emerged in West Bengal following recent announcements about plans for new religious structures in Murshidabad district, including a proposed mosque to be named Babri Masjid and a separate announcement by a BJP leader regarding the construction of a Ram temple in another location within Behrampur.

Global LNG boom 'threatens climate goals': Banks urged to end financing

By A Representative   The world is on the brink of an unprecedented surge in Liquefied Natural Gas (LNG) development, with 279 new projects planned globally, threatening to derail international climate goals and causing severe local impacts. This stark warning comes from a coalition of organizations—including Reclaim Finance, Rainforest Action Network, BankTrack, and others—that today launched the " Exit LNG " website, a new mapping project exposing the extent of the expansion, the companies involved, and their bank financiers.