Skip to main content

Sardar Sarovar dam, industrial effluents in South Gujarat "adversely affecting" fish catch in Narmada estuary

Fisherfolk near the Narmada estuary
By A Representative
Is the anti-dam sentiment downstream area of the Narmada river finally beginning to raise its head in Gujarat? This is the impression gained by senior activists of Delhi-based NGO, South Asia Network on Dams, Rivers and People (SANDRP), and Ahmedabad-based NGO Paryavaran Mitra, who visited areas next to the Narmada estuary. An interview-based analysis by Amruta Pradhan of SANDRP, based on the visit, suggests that fisherfolk particularly are clearly feeling the pinch of the obstructions in the Narmada river, especially by the dam, which is situated about 126 km on the upstream.
Pradhan quotes Kamalesh Madhiwala, an advocate, to represent the sentiment of the fisherfolk: “Yield of hilsa has drastically reduced after the Sardar Sarovar dam was built. There has been a reduction of 65 to 70 per cent. Overall water level of the estuary has gone down. Post-monsoon, the river becomes so dry that we can walk across the riverbed. This had never happened in the past before the Sardar Sarovar dam was built.”
In fact, Pradhan was told, a decade ago there used to be 70 to 80 types of fish varieties available in the estuary. Now they get only about 10 to 12 fish varieties. Earlier, along with hilsa many other riverine species like prawns, mahseer etc. were equally important, but all these “vanquished” in after the dam. Now the fisher people’s income is solely dependent on hilsa which is very sensitive species.
Accompanied by Bhupat Solanki of the Paryavaran Mitra, during a meeting with locals it was also revealed that people, especially fisherfolk, are also sharply attacking the industrial development in South Gujarat, especially in Bharuch district for a drastic reduction in the yield of hilsa, the most important fish which remains the main source of their livelihood.
Apart from the dam, Pradhan says, the Narmada estuary is “facing growing pressures from industrial estates. Bharuch district has 13 industrial estates with 137 medium- and large-scale units of chemicals, textiles, plastics, fertilizer sectors. Industrial estate of Dahej, which is in close proximity to Bhadbhut, releases its untreated effluent in the sea near Bharuch. This is affecting the overall water quality of the estuary", affecting the fish catch. The Petroleum and Petro-Chemical Industrial Region (PCPIR) in the region has further accelerated things, they feel.
Meanwhile, the view has gained that with the proposed construction of the barrage on the Narmada river, next to Bhadbhut, at the cost of Rs 4,000 crore, things would only further deteriorate. On July 7, 2014 local fisherfolk organized a protest rally at the district magistrate’s office and more than 4,000 fisher people were a part of this. This is our fourth rally opposing the project. 
Boats in the estuary
Pradhan quotes Praveen Madhiwala, a fish trader and exporter, to say, “If the dam at Bhadbhut comes up, hilsa will be finished. Not only that, but the dam will prove to be destructive to the entire estuary.” The explanation, is this: “Tidal flow of water spreads 60 km from sea shore to upstream of the estuary. They are planning to build the barrage just 25 km upstream of the sea shore. What will happen then to the incoming salt water during high tide?”
Madhiwala adds, “It is bound to spread laterally along the barrage spreading in the coastal region and will be destructive to the settlements along the coastline. Calculating all these numbers on paper is very different than experiencing the destructive power of sea. We know what the sea can do.”
The fisher people’s cooperative, Bhadbhut Matsya Udyog Sahakari Mandali, said Pradhan, is preparing to file a public interest litigation (PIL) “challenging the barrage project”. At stake is the “livelihood of more than 30,000 people.” Praveen Macchi, a fisherman, is quoted as saying that “the overall salinity of the estuary has gone up due to severely restricted freshwater flow into the estuary. Fish diversity has reduced and riverine fish movement is obstructed due to SSP. Hilsa would be available till December-January.”
He says: “Narmada has been hilsa’s favoured habitat. Earlier hilsa was found in Tapi estuary near Surat as well. But after the Ukai dam was constructed, only two to five per cent of hilsa arrive at the Tapi estuary. Lives of fisherfolk in the estuary have been devastated. The problem of livelihood of these people became so serious that there are instances where women of the community had to get into prostitution.”

Comments

TRENDING

From algorithms to exploitation: New report exposes plight of India's gig workers

By Jag Jivan   The recent report, "State of Finance in India Report 2024-25," released by a coalition including the Centre for Financial Accountability, Focus on the Global South, and other organizations, paints a stark picture of India's burgeoning digital economy, particularly highlighting the exploitation faced by gig workers on platform-based services. 

'Condonation of war crimes against women and children’: IPSN on Trump’s Gaza Board

By A Representative   The India-Palestine Solidarity Network (IPSN) has strongly condemned the announcement of a proposed “Board of Peace” for Gaza and Palestine by former US President Donald J. Trump, calling it an initiative that “condones war crimes against children and women” and “rubs salt in Palestinian wounds.”

Gig workers hold online strike on republic day; nationwide protests planned on February 3

By A Representative   Gig and platform service workers across the country observed a nationwide online strike on Republic Day, responding to a call given by the Gig & Platform Service Workers Union (GIPSWU) to protest what it described as exploitation, insecurity and denial of basic worker rights in the platform economy. The union said women gig workers led the January 26 action by switching off their work apps as a mark of protest.

India’s road to sustainability: Why alternative fuels matter beyond electric vehicles

By Suyash Gupta*  India’s worsening air quality makes the shift towards clean mobility urgent. However, while electric vehicles (EVs) are central to India’s strategy, they alone cannot address the country’s diverse pollution and energy challenges.

Jayanthi Natarajan "never stood by tribals' rights" in MNC Vedanta's move to mine Niyamigiri Hills in Odisha

By A Representative The Odisha Chapter of the Campaign for Survival and Dignity (CSD), which played a vital role in the struggle for the enactment of historic Forest Rights Act, 2006 has blamed former Union environment minister Jaynaynthi Natarjan for failing to play any vital role to defend the tribals' rights in the forest areas during her tenure under the former UPA government. Countering her recent statement that she rejected environmental clearance to Vendanta, the top UK-based NMC, despite tremendous pressure from her colleagues in Cabinet and huge criticism from industry, and the claim that her decision was “upheld by the Supreme Court”, the CSD said this is simply not true, and actually she "disrespected" FRA.

Stands 'exposed': Cavalier attitude towards rushed construction of Char Dham project

By Bharat Dogra*  The nation heaved a big sigh of relief when the 41 workers trapped in the under-construction Silkyara-Barkot tunnel (Uttarkashi district of Uttarakhand) were finally rescued on November 28 after a 17-day rescue effort. All those involved in the rescue effort deserve a big thanks of the entire country. The government deserves appreciation for providing all-round support.

Whither space for the marginalised in Kerala's privately-driven townships after landslides?

By Ipshita Basu, Sudheesh R.C.  In the early hours of July 30 2024, a landslide in the Wayanad district of Kerala state, India, killed 400 people. The Punjirimattom, Mundakkai, Vellarimala and Chooralmala villages in the Western Ghats mountain range turned into a dystopian rubble of uprooted trees and debris.

Over 40% of gig workers earn below ₹15,000 a month: Economic Survey

By A Representative   The Finance Minister, Nirmala Sitharaman, while reviewing the Economic Survey in Parliament on Tuesday, highlighted the rapid growth of gig and platform workers in India. According to the Survey, the number of gig workers has increased from 7.7 million to around 12 million, marking a growth of about 55 percent. Their share in the overall workforce is projected to rise from 2 percent to 6.7 percent, with gig workers expected to contribute approximately ₹2.35 lakh crore to the GDP by 2030. The Survey also noted that over 40 percent of gig workers earn less than ₹15,000 per month.

Fragmented opposition and identity politics shaping Tamil Nadu’s 2026 election battle

By Syed Ali Mujtaba*  Tamil Nadu is set to go to the polls in April 2026, and the political battle lines are beginning to take shape. Prime Minister Narendra Modi’s visit to the state on January 23, 2026, marked the formal launch of the Bharatiya Janata Party’s campaign against the ruling Dravida Munnetra Kazhagam (DMK). Addressing multiple public meetings, the Prime Minister accused the DMK government of corruption, criminality, and dynastic politics, and called for Tamil Nadu to be “freed from DMK’s chains.” PM Modi alleged that the DMK had turned Tamil Nadu into a drug-ridden state and betrayed public trust by governing through what he described as “Corruption, Mafia and Crime,” derisively terming it “CMC rule.” He claimed that despite making numerous promises, the DMK had failed to deliver meaningful development. He also targeted what he described as the party’s dynastic character, arguing that the government functioned primarily for the benefit of a single family a...