Vadodara riverfront project without environmental impact assessment?

By Rohit Prajapati, Trupti Shah*
The Vadodara Mahanagar Seva Sadan’s (VMSS) proposed Vishwamitri Riverfront Development Project resembles a mere real estate project. The “planned” Riverfront Project completely ignores the important characteristics of the river, its wetlands, ravines, biodiversity, flora and fauna, flood and floodplains etc. Many times sophisticated language and concepts are used in the feasibility report of the Vishwamitri Riverfront Development Project, but if one closely examines the report, it becomes abundantly clear that those words are not understood in letter and spirit.
The project work for the Vishwamitri Riverfront Development Project is being carried out hastily and mindlessly, without having conducted the mandatory Environment Impact Assessment (EIA) and Social Impact Assessment (SIA). The VMSS is using the people’s money in blatant violation of several laws of the land, including the following:
(1) The Wildlife (Protection) Act, 1972.
(2) Environmental Impact Assessment (EIA) Notification, 2006 under the Environment (Protection) Act 1986.
(3) The Environment (Protection) Act 1986.
(4) The Wetlands (Conservation and Management) Rules, 2010.
The VMSS fails to understand the fact that the first step in any effort for the revival of the Vishwamitri River must be a proper understanding of what a river is.
A river is more than a channel carrying water; it is also a transporter of sediment; it is also the catchments, the river-bed, the banks, the vegetation on both sides, and the floodplain. A river harbours and interacts with innumerable organisms like plants, animals and microbes. It is a natural, living, organic whole, a hydrological and ecological system, and part of a larger ecological system. A river is also a network of tributaries and distributaries spread over its basin and the estuary.
The Vishwamitri River originating from the Pavagadh Hills has a unique ecosystem bearing a plethora of beautiful ravines right from its beginning till its end. Of paramount importance in its ecology is the presence of the highly protected species, the Indian crocodile. The crocodiles have been inhabiting and breeding in an 18 km stretch of the Vishwamitri River for thousands of years. The importance of this species is illustrated by the multiple legal and policy efforts which have been developed by the Government of India to protect the crocodile’s population.
As early as the late 1960s, “Indian Crocodile Conservation Project” was launched. Subsequently the crocodile has been included in Appendix-I of the Convention of International Trade in Endangered Species (CITES) and brought under Schedule-I of The Wild Life (Protection) Act, 1972, meaning that any activity which is against the survival of the highly protected species without having been approved by the State Wildlife Board/ National Wildlife Board and the Government of India is patently illegal.
This brings one to the glaring fact that the activities carried out by the VMSS in the name of the Vishwamitri Riverfront Development Project, especially the proposed construction activities vis-a-vis JCB dumper, etc., have the potential to lead to destruction of the natural ecosystem and habitat of the crocodile but also its breeding grounds and nests.
It becomes abundantly clear that in the absence of any EIA or scientific study on the potential impacts to the protected and threatened crocodile, and the mandatory approval from the appropriate authorities, Vadodara Mahanagar Seva Sadan is in blatant violation of the Wildlife (Protection) Act, 1972. The said activity would amount to “hunting” as defined in Section 2 (16) of the said Act as follows:
“(16) “Hunting” with its grammatical variations and cognate expressions, includes:
Killing or poisoning of any wild animal or captive animal and every attempt to do so;
Capturing, coursing, snaring, trapping, driving or baiting any wild or captive animal and every attempt to do so;
Injuring or destroying or taking any part of the body or any such animal or in the case of wild birds or reptiles, damaging the eggs or such birds or reptiles, or disturbing the eggs or nests of such birds or reptiles.”
Further, the Environmental Clearance required under the (EIA) Notification of September, 2006, has not been applied for in respect to the Vishwamitri Riverfront Development Project. This is apparent in the fact that the VMSS has in November 2014 issued a tender for a consultant to conduct the EIA for the same.
Regardless, the project proponent has gone ahead with construction activities despite the fact that Section 6 of the EIA Notification of 2006 explicitly states, “An application seeking prior environmental clearance in all cases shall be made in the prescribed Form 1 annexed herewith and Supplementary Form 1A, if applicable, as given in Appendix II, after the identification of prospective site(s) for the project and/or activities to which the application relates, before commencing any construction activity, or preparation of land, at the site by the applicant.”
The environmental risk posed by the impugned project is further amplified by the fact that the same is being constructed on the wetlands of River Vishwamitri. Allowing the project to continue will result in irreversible damage to the ecology of the said wetlands which are sought to be protected by the Wetlands (Conservation and Management) Rules, 2010.
It is shocking that the VMSS has failed to analyse and plan based on the ground realities of the Vishwamitri River. The river experiences frequent flooding which is due to water logging and human induced activities.
The riparian vegetation along the banks of the Vishwamitri River, not only nurtures a rich biodiversity but also plays a crucial role in retaining water during heavy rainfall and in ground water recharge – particularly the ox-bows. Engineering the banks would convert the river into a huge ‘pipe’ which would lead to a further increase in flooding and obstruction to the natural course of ground water recharge.
Further, it is a well known fact that both municipal waste and untreated municipal sewage are routinely being dumped into the Vishwamitri River in contravention of the Municipal Solid Wastes (Management and Handling) Rules, 2000. The impugned project should not be allowed to progress in the absence of a comprehensive plan to stop the dumping of untreated sewage which is a health and environmental hazard, to protect its banks, remove the existing municipal waste that has been dumped, and return land which is currently being used for dumping back to the river.
The fact that VMSS has circumvented the mandatory EIA is even more egregious seeing as it also has failed to engaged in a meaningful a Social Impact Assessment for the impugned project. This large scale construction is bound to result in not only damage to the river, riverbed, downstream river, its biodiversity, its active water body and the wetlands, but it will also impact the people living downstream and their livelihoods. Further, the impugned Project had already displaced more than 5,000 people and many more are going to be displaced by the Riverfront Project.
Lastly, the creation of real estate to ‘mitigate’ or offset the cost of the project as proposed by VMSS has to be validated by the ‘need’ of land for development. There are ample properties in Vadodara that are vacant or ‘for investment’ purposes. The residents of Vadodara are paying the costs of such dead investment. Further, clearing the vegetation and building the banks would only add to the heat island effect and micro-climate of the city.
The river and the lake systems offer a tremendous opportunity to reduce pollution, increase green cover and hence our ground water table. However, in the absence of holistic planning, application of legal mechanisms and scientific thought this opportunity will be thrown to the wind and there will be no river, nor riverfront, left to speak of.
The urgent matter at hand is that the VMSS has commenced work on the impugned Riverfront Project. However, no EIA, Social Impact Assessment, environmental public hearing, nor any steps in preparing a management plan, including appraisal, monitoring and compliance mechanism have been undertaken by the VMSS for the impugned project.
Under these circumstances the competent authorities in the Government of India and the Gujarat government should...
Direct the VMSS to take adequate and necessary measures to ensure stoppage of any further work in the ‘Vishwamitri Riverfront Development Project’, or any component thereof.
Direct the VMSS to stop the untreated municipal sewage from being dumped into the river.
Direct the VMSS to remove the municipal waste which has been dumped into the ravine of Vishwamitri River and take steps to prevent the further dumping of the same.
Initiate legal action under Sections 15 and 16 of the Environmental (Protection) Act 1986 against the concerned individuals and companies that have started work or given permission for work of Vishwamitri Riverfront Project, or any component thereof.
Initiate legal action under Section 17 of the Environment (Protection) Act 1986 against the concerned officers who have failed to ensure complete compliance of the Environment (Protection) Act, 1986 before allowing commencement of the work in respect of Vishwamitri Riverfront Development Project.
Direct the VMSS to submit the status report of present Vishwamitri Riverfront Development Project like money spent for the project and activities on the site carried out by them up till now and based on that direct them to take all necessary steps for restitution of the project area to its status quo ante.
As the Project has already displaced more than 5,000 people and many more are going to be displaced by the Riverfront Project, declare such activities carried out by the VMSS as illegal and initiate legal action against the concerned officers for such an illegal act as no activities of project can be carried out before the environment clearance is obtain by the authorities. Direct them to take all necessary steps for restitution of the project area to its status quo ante.

All activities for the Vishwamitri Riverfront Development Project should be ceased, no further work should be commenced until due process of environmental clearance is undertaken. If project activities are not immediately stopped, it would invite legal action.

*With Paryavaran Suraksha Samiti

Comments

TRENDING

Urgent need to study cause of large number of natural deaths in Gulf countries

By Venkatesh Nayak* According to data tabled in Parliament in April 2018, there are 87.76 lakh (8.77 million) Indians in six Gulf countries, namely Bahrain, Kuwait, Oman, Qatar, Saudi Arabia and the United Arab Emirates (UAE). While replying to an Unstarred Question (#6091) raised in the Lok Sabha, the Union Minister of State for External Affairs said, during the first half of this financial year alone (between April-September 2018), blue-collared Indian workers in these countries had remitted USD 33.47 Billion back home. Not much is known about the human cost of such earnings which swell up the country’s forex reserves quietly. My recent RTI intervention and research of proceedings in Parliament has revealed that between 2012 and mid-2018 more than 24,570 Indian Workers died in these Gulf countries. This works out to an average of more than 10 deaths per day. For every US$ 1 Billion they remitted to India during the same period there were at least 117 deaths of Indian Workers in Gulf ...

A comrade in culture and controversy: Yao Wenyuan’s revolutionary legacy

By Harsh Thakor*  This year marks two important anniversaries in Chinese revolutionary history—the 20th death anniversary of Yao Wenyuan, and the 50th anniversary of his seminal essay "On the Social Basis of the Lin Biao Anti-Party Clique". These milestones invite reflection on the man whose pen ignited the first sparks of the Great Proletarian Cultural Revolution and whose sharp ideological interventions left an indelible imprint on the political and cultural landscape of socialist China.

India's health workers have no legal right for their protection, regrets NGO network

Counterview Desk In a letter to Union labour and employment minister Santosh Gangwar, the civil rights group Occupational and Environmental Health Network of India (OEHNI), writing against the backdrop of strike by Bhabha hospital heath care workers, has insisted that they should be given “clear legal right for their protection”.

Uttarakhand tunnel disaster: 'Question mark' on rescue plan, appraisal, construction

By Bhim Singh Rawat*  As many as 40 workers were trapped inside Barkot-Silkyara tunnel in Uttarkashi after a portion of the 4.5 km long, supposedly completed portion of the tunnel, collapsed early morning on Sunday, Nov 12, 2023. The incident has once again raised several questions over negligence in planning, appraisal and construction, absence of emergency rescue plan, violations of labour laws and environmental norms resulting in this avoidable accident.

History, culture and literature of Fatehpur, UP, from where Maulana Hasrat Mohani hailed

By Vidya Bhushan Rawat*  Maulana Hasrat Mohani was a member of the Constituent Assembly and an extremely important leader of our freedom movement. Born in Unnao district of Uttar Pradesh, Hasrat Mohani's relationship with nearby district of Fatehpur is interesting and not explored much by biographers and historians. Dr Mohammad Ismail Azad Fatehpuri has written a book on Maulana Hasrat Mohani and Fatehpur. The book is in Urdu.  He has just come out with another important book, 'Hindi kee Pratham Rachna: Chandayan' authored by Mulla Daud Dalmai.' During my recent visit to Fatehpur town, I had an opportunity to meet Dr Mohammad Ismail Azad Fatehpuri and recorded a conversation with him on issues of history, culture and literature of Fatehpur. Sharing this conversation here with you. Kindly click this link. --- *Human rights defender. Facebook https://www.facebook.com/vbrawat , X @freetohumanity, Skype @vbrawat

Job opportunities decreasing, wages remain low: Delhi construction workers' plight

By Bharat Dogra*   It was about 32 years back that a hut colony in posh Prashant Vihar area of Delhi was demolished. It was after a great struggle that the people evicted from here could get alternative plots that were not too far away from their earlier colony. Nirmana, an organization of construction workers, played an important role in helping the evicted people to get this alternative land. At that time it was a big relief to get this alternative land, even though the plots given to them were very small ones of 10X8 feet size. The people worked hard to construct new houses, often constructing two floors so that the family could be accommodated in the small plots. However a recent visit revealed that people are rather disheartened now by a number of adverse factors. They have not been given the proper allotment papers yet. There is still no sewer system here. They have to use public toilets constructed some distance away which can sometimes be quite messy. There is still no...

Women's rights leaders told to negotiate with Muslimness, as India's donor agencies shun the word Muslim

By A Representative Former vice-president Hamid Ansari has sharply criticized donor agencies engaged in nongovernmental development work, saying that they seek to "help out" marginalizes communities with their funds, but shy away from naming Muslims as the target group, something, he insisted, needs to change. Speaking at a book release function in Delhi, he said, since large sections of Muslims are poor, they need political as also social outreach.

Warning bells for India: Tribal exploitation by powerful corporate interests may turn into international issue

By Ashok Shrimali* Warning bells are ringing for India. Even as news drops in from Odisha that Adivasi villages, one after another, are rejecting the top UK-based MNC Vedanta's plea for mining, a recent move by two senior scholars Felix Padel and Samarendra Das suggests the way tribals are being exploited in India by powerful international and national business interests may become an international issue. In fact, one has only to count days when things may be taken up at the United Nations level, with India being pushed to the corner. Padel, it may be recalled, is a major British authority on indigenous peoples across the world, with several scholarly books to his credit. 

Gujarat Bitcoin scam worth Rs 5,000 crore "linked" with BJP leaders: Need for Supreme Court monitored probe

By Shaktisinh Gohil* BJP hit a jackpot in the form of demonetisation, which it used as an alibi to convert black money into white in Gujarat. Even as party scrambles for answers of how the Ahmedabad District Cooperative Bank (ADCB), whose director is BJP president Amit Shah, received old currency worth Rs 745.58 crore in just five days, and how Rs 3118.51 crore was deposited in 11 district cooperative banks linked with Gujarat BJP leaders, a new mega Bitcoin scam, worth more than Rs 5,000 crore has been unraveled.