Tata Mundra: Ombudsman talks tough on non-compliance of eco norms

By Rajiv Shah 
The Office of the Compliance Advisor Ombudsman (CAO) for the International Finance Corporation (IFC), which is part of the World Bank group, has, in its fresh report, released on October 23, 2013, said that there is enough reason to believe in evidence provided by the Machimar Adhikar Sangharsh Sangathan (MASS), or the Association for the Struggle for Fishworkers’ Rights, regarding environmental and livelihood concerns of the people of Mundra, Kutch district, where the $4.14 billion dollar project the Tatas’ Ultra Mega Power Plant is being implemented. The concern is significant as the IFC is financing $450 million in the form of “a straight senior loan”.
While welcoming the CAO report, MASS has said, “The findings reconfirm the concerns we raised since project construction started. CAO’s expert findings help bolster our fight to regain the damaged livelihoods of thousands of fishing families in Kutch coast.. It failed to account fisher people as project-affected people, to adequately assess and mitigate environmental and livelihood impacts, and to comply with mandatory performance standards and national regulations, among others. Dispute resolution attempts did not work, leading CAO in 2012 to do a compliance appraisal, which concluded that MASS complaint merited a full investigation.”
While CAO report falls short of calling for IFC’s withdrawal from the project, the CAO has found much truth in the complaints made by MASS against the project, which being implemented in the name of the Tata Power’s subsidiary, the Coastal Gujarat Power Ltd. (CGPL). These complaints related to:
(a) Failure to identify the complainants as project-affected people during preparation of the project
(b) Physical and economic displacement of fisher people from seasonal settlements and fish drying areas in the intertidal zone
(c) Impact of coal ash and other airborne pollution on fish drying and public health
(d) Alleged lack of compliance with national regulations in relation to the decision to construct a once through cooling system
(e) Impacts on marine environment and long-term decline in fish stocks due to destruction of mangroves and construction/operation of the plant (especially the cooling system)
(f) Failure to consider expansion of Mundra Port as an associated development or to consider the investment in the context of cumulative impacts of related developments
(g) Impacts on additional livelihood groups (namely, graziers and salt pan workers) that were not adequately identified or mitigated
(h) Social impacts of increases in the cost of power beyond that which was projected in the project documentation
(i) Failure to consider technically and financially feasible design alternatives to minimize economic and social (E&S) impact
(j) Adequacy of IFC’s supervision of E&S aspects of the project.
The CAO’s report underlines, “The (UMPP) project was assigned IFC’s environmental and social category A, signifying that it has potential significant adverse social and/or environmental impacts that are diverse, irreversible, or unprecedented. In the context of the complaint, it is significant that the coastline around Mundra is undergoing rapid industrial transformation. In addition to the construction of the CGPL power plant, this involves the development of the Adani Group’s Mundra Port and Special Economic Zone (MPSEZ), which includes significant expansion of existing port facilities and the construction of a 4620 MW coal-fired power plant (Adani Power).”
More specifically, the report says, “The complainants are identified as fisher people belonging to the minority Wagher community of Muslims, a group characterized by the Government of India as a socially and educationally backward caste”, adding, “Also relevant is their migratory lifestyle, which is dependent on natural resources. As asserted in the complaint, the fisher people traditionally migrate from often distant home villages to the bunder (fishing harbours), where they live during a fishing season of eight to nine months each year.” In this context, “improper mitigation or insufficient community engagement” were identified as possibly triggering “opposition from project-affected communities or unacceptable environmental impacts.”
CAO report notes that the E&S assessment documentation, including the Stakeholder Engagement and Benefit Sharing Study (focusing on Tragadi village), and the Needs Assessment of Modhva village (both published in 2011), “lack an assessment of the impact of the project on the fishing communities of these villages.” Further, “these reports contain no baseline data with regard to the households living seasonally on Tragadi bunder or Kotadi bunder.” In fact, CAO finds that the IFC’s review of its client’s E&S assessments was not “commensurate with risk in relation to fisher people seasonally resident on Tragadi and Kotadi bunders as required by the sustainability policy.”
Directing its guns towards the Tata Power’s financiers, the CAO report states, “The IFC paid insufficient attention to the requirements of the Performance Standards — that the client prepare an adequate, accurate and objective assessment of all relevant E&S risks and impacts of the project based on appropriate social baseline data.” It finds this to be of particular concern “in relation to the complainant communities, given that they are statutorily recognized as educationally and socially disadvantaged and acknowledged by IFC to be vulnerable.”
Without any baseline assessment of these communities, CAO says, “Neither IFC nor its client (Tata Power) is in a strong position to refute or respond to claims regarding the impact that the project is having or will have on households.” In fact, given the nature and scale of the project – the proximity of the cooling water intake/outfall channels to the seasonal fishing settlements (on the bunders), the content of the ESIA material available to IFC, and documented concerns raised by fisher people regarding the impacts of the project since 2006 – CAO insists it is not convinced by the IFC’s position that “the risk of adverse impact to these households was so slight as not to require objective assessment.”
CAO particularly notes the IFC’s believed “the seasonally resident community was reluctant to engage in a study of the type undertaken for Tradagi and Modhva…” and that the Tata Power “is actively engaged with MASS (…) to address their concerns [and] undertake a survey.” Disagreeing with such a view of the IFC, the report asserts, “While a baseline survey and impact assessment at this stage would be positive remedial measures”, there was the need for a “thorough assessment of potential social and environmental impacts and risks from the early stages of project development”. CAO finds that the affecting communities were engaged late, making the “rigorous E&S assessment difficult”.
In fact, the CAO says, the IFC “engaged with this project based on the view that it will have no or negligible negative impact on the communities living seasonally on the bunders. Thus IFC’s verification focused on those villages losing land to the main project site. As a result, IFC did not pay adequate attention to verifying whether pre-project consultation requirements were met in relation to groups (including fisher people) that had been identified in the E&S assessment process as project affected community resource users resident outside these villages.”
In fact, consultations with the fishing communities “occurred after key decisions in relation to the design of the cooling system had been made”. In these circumstances, the IFC “failed to assure itself that directly affected fishing communities were engaged in effective consultation.” In particular, the consultations should have been “based on the prior disclosure of relevant and adequate information, including draft documents and plans” and “should begin early in the Social and Environmental Assessment process”. In relation to these findings, CAO disagrees with the IFC’s view that “while the process could have been better, the outcome is consistent with the performance standards, This only suggests that there is lack of effective consultation with fishing communities early in the project cycle process resulted in missed opportunities to assess, avoid and reduce adverse potential adverse impacts of the project.”
Taking into account the nature of the project and IFC’s identification of these risks, CAO further finds that the IFC’s E&S review regarding marine impact “did not meet the due diligence requirements set out in the sustainability policy”. In particular, CAO finds that IFC’s E&S review was not “appropriate to the nature and scale of the project” or “commensurate with risk”. As a result, CAO says, “important opportunities were missed to: (a) request more detailed baseline information about the marine environment of the affected area; (b) incorporate appropriate analysis of the potential marine (and associated social) impact of the project into design considerations and the client’s E&S management system; and (c) develop a framework to support adequate marine impact monitoring (specifically, monitoring that goes beyond gross changes to marine ecological receptors).”
In fact, the CAO notes, “No mixing zone was defined in the marine environment impact assessment (MEIAs) or subsequently; thus compliance cannot be demonstrated. Projections that the thermal plume from the (UMPP’s) outfall channel will extend a distance of kilometres into the shallow waters of the gulf and surrounding estuaries suggest inadequate mixing/cooling, with significant risks of ecological impact. These risks are heightened by claims that the plume will intersect with components of the ecosystem which the complainants assert are important to their livelihoods.”
CAO says, the IFC acknowledges “drifts and other local nets are commonly used by local fishermen community”, yet “the livelihoods of these communities are not further documented in the MEIA.” Actually, the MEIA’s focus was more “on larger scale commercial fishing operations which are conducted further off shore. The result is a conclusion that the impact of the project on fisheries is likely to be “minor and non-consequential” while at the same time predicting that the marine ecology of the inshore area local to the plant (where the complainants assert to fish) will be negatively affected during construction and operation.”
Hence, the CAO believes that the statements in the Socio-Economic Assessment appended to the comprehensive environmental impact assessment (CEIA, 2007) – that “the livelihood of fishermen will not be affected” – are similarly “not supported by analysis of the livelihoods of the complainant fishing communities. In fact, it is premised on the assumption that “disposal of treated effluent from desalination plant and cooling system will not have any impact on local ecology and marine life, if disposed to deep sea through a properly designed out fall structures”. CAO notes, this raises concern regarding the organizations that conducted the impact assessments that IFC relied on – the Tata Consulting Engineers’ (TCE), which is a part of the Tata Group. It says, “This weakens the case that the CEIA was an external expert assessment”.
CAO also notes “confusion in relation to how the CEIA measured ambient air quality”. In the methodology section, the CEIA reports that ambient air samples were collected twice a week over 52 weeks from March 2006 to February 2007. “At other points in the report, however, reference is made to data from three seasons between March 2006 and February 2007. “Similar confusion exists in ADB’s 2007 Environmental Assessment Report for the project, which states that samples were collected twice a week over the 52 weeks from March 2006 to February, at the same time as noting that the monsoon season was not considered for the purposes of the EIA”, the report adds.
This leads one to conclude, says CAO, that “it was unclear to IFC at appraisal whether ambient concentrations of particulate matter exceeded National Ambient Air Quality Standards (NAAQS) standards (though the three-season average was trending approximately 13% above the annual average standard).” In fact, data indicated that “the airshed was degraded according to the applicable Thermal Power Guidelines”; and the Tata Power’s E&S consultant has “reported since at least May 2009 that both NAAQS and IFC ambient air standards are being exceeded”. In addition to being noncompliant, CAO finds that “IFC’s approach to the issue of air quality represents a minimalist interpretation of its standards, which is at odds with a stated rationale for its involvement in the project, namely, improved E&S performance through compliance with standards that are more stringent than national requirements.”

Comments

TRENDING

Urgent need to study cause of large number of natural deaths in Gulf countries

By Venkatesh Nayak* According to data tabled in Parliament in April 2018, there are 87.76 lakh (8.77 million) Indians in six Gulf countries, namely Bahrain, Kuwait, Oman, Qatar, Saudi Arabia and the United Arab Emirates (UAE). While replying to an Unstarred Question (#6091) raised in the Lok Sabha, the Union Minister of State for External Affairs said, during the first half of this financial year alone (between April-September 2018), blue-collared Indian workers in these countries had remitted USD 33.47 Billion back home. Not much is known about the human cost of such earnings which swell up the country’s forex reserves quietly. My recent RTI intervention and research of proceedings in Parliament has revealed that between 2012 and mid-2018 more than 24,570 Indian Workers died in these Gulf countries. This works out to an average of more than 10 deaths per day. For every US$ 1 Billion they remitted to India during the same period there were at least 117 deaths of Indian Workers in Gulf ...

A comrade in culture and controversy: Yao Wenyuan’s revolutionary legacy

By Harsh Thakor*  This year marks two important anniversaries in Chinese revolutionary history—the 20th death anniversary of Yao Wenyuan, and the 50th anniversary of his seminal essay "On the Social Basis of the Lin Biao Anti-Party Clique". These milestones invite reflection on the man whose pen ignited the first sparks of the Great Proletarian Cultural Revolution and whose sharp ideological interventions left an indelible imprint on the political and cultural landscape of socialist China.

India's health workers have no legal right for their protection, regrets NGO network

Counterview Desk In a letter to Union labour and employment minister Santosh Gangwar, the civil rights group Occupational and Environmental Health Network of India (OEHNI), writing against the backdrop of strike by Bhabha hospital heath care workers, has insisted that they should be given “clear legal right for their protection”.

Uttarakhand tunnel disaster: 'Question mark' on rescue plan, appraisal, construction

By Bhim Singh Rawat*  As many as 40 workers were trapped inside Barkot-Silkyara tunnel in Uttarkashi after a portion of the 4.5 km long, supposedly completed portion of the tunnel, collapsed early morning on Sunday, Nov 12, 2023. The incident has once again raised several questions over negligence in planning, appraisal and construction, absence of emergency rescue plan, violations of labour laws and environmental norms resulting in this avoidable accident.

History, culture and literature of Fatehpur, UP, from where Maulana Hasrat Mohani hailed

By Vidya Bhushan Rawat*  Maulana Hasrat Mohani was a member of the Constituent Assembly and an extremely important leader of our freedom movement. Born in Unnao district of Uttar Pradesh, Hasrat Mohani's relationship with nearby district of Fatehpur is interesting and not explored much by biographers and historians. Dr Mohammad Ismail Azad Fatehpuri has written a book on Maulana Hasrat Mohani and Fatehpur. The book is in Urdu.  He has just come out with another important book, 'Hindi kee Pratham Rachna: Chandayan' authored by Mulla Daud Dalmai.' During my recent visit to Fatehpur town, I had an opportunity to meet Dr Mohammad Ismail Azad Fatehpuri and recorded a conversation with him on issues of history, culture and literature of Fatehpur. Sharing this conversation here with you. Kindly click this link. --- *Human rights defender. Facebook https://www.facebook.com/vbrawat , X @freetohumanity, Skype @vbrawat

Job opportunities decreasing, wages remain low: Delhi construction workers' plight

By Bharat Dogra*   It was about 32 years back that a hut colony in posh Prashant Vihar area of Delhi was demolished. It was after a great struggle that the people evicted from here could get alternative plots that were not too far away from their earlier colony. Nirmana, an organization of construction workers, played an important role in helping the evicted people to get this alternative land. At that time it was a big relief to get this alternative land, even though the plots given to them were very small ones of 10X8 feet size. The people worked hard to construct new houses, often constructing two floors so that the family could be accommodated in the small plots. However a recent visit revealed that people are rather disheartened now by a number of adverse factors. They have not been given the proper allotment papers yet. There is still no sewer system here. They have to use public toilets constructed some distance away which can sometimes be quite messy. There is still no...

Women's rights leaders told to negotiate with Muslimness, as India's donor agencies shun the word Muslim

By A Representative Former vice-president Hamid Ansari has sharply criticized donor agencies engaged in nongovernmental development work, saying that they seek to "help out" marginalizes communities with their funds, but shy away from naming Muslims as the target group, something, he insisted, needs to change. Speaking at a book release function in Delhi, he said, since large sections of Muslims are poor, they need political as also social outreach.

Gujarat Bitcoin scam worth Rs 5,000 crore "linked" with BJP leaders: Need for Supreme Court monitored probe

By Shaktisinh Gohil* BJP hit a jackpot in the form of demonetisation, which it used as an alibi to convert black money into white in Gujarat. Even as party scrambles for answers of how the Ahmedabad District Cooperative Bank (ADCB), whose director is BJP president Amit Shah, received old currency worth Rs 745.58 crore in just five days, and how Rs 3118.51 crore was deposited in 11 district cooperative banks linked with Gujarat BJP leaders, a new mega Bitcoin scam, worth more than Rs 5,000 crore has been unraveled.

Warning bells for India: Tribal exploitation by powerful corporate interests may turn into international issue

By Ashok Shrimali* Warning bells are ringing for India. Even as news drops in from Odisha that Adivasi villages, one after another, are rejecting the top UK-based MNC Vedanta's plea for mining, a recent move by two senior scholars Felix Padel and Samarendra Das suggests the way tribals are being exploited in India by powerful international and national business interests may become an international issue. In fact, one has only to count days when things may be taken up at the United Nations level, with India being pushed to the corner. Padel, it may be recalled, is a major British authority on indigenous peoples across the world, with several scholarly books to his credit.